SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 76<br />

that potential impacts of the project are minimised, and that the significance of those impacts is as<br />

predicted by the <strong>EIA</strong> process.<br />

Management and monitoring measures were developed from the recommendations and mitigation<br />

measures listed in the <strong>EIA</strong> Report (Section 6). The tables with mitigation measures relevant to the<br />

pipelines project are contained in the tables below. The measures in the EMMP are structured to<br />

facilitate their incorporation into tender documents and ease of on-site implementation.<br />

The mitigation measures should be implemented within the framework provided in the EMMP<br />

developed for the Refinery Expansion Project (SRK Report No. 398251/8, January 2010). That<br />

EMMP lays out a structure for the implementation of measures and the monitoring of and reporting<br />

on environmental performance. Generally, the EMMP is a living document and environmental<br />

management must be reviewed and adapted throughout the construction phase and lifetime of the<br />

pipeline to respond to specific operational circumstances.<br />

Mitigation measures apply to the following three phases of the pipelines project:<br />

• Design Phase: These measures relate to the detailed layout, planning and design of the<br />

pipelines and their alignment and associated infrastructure. They will largely be implemented by<br />

the planning and development team, prior to the commencement of any physical on-site<br />

activities. These mitigation measures are presented in Table 6-14.<br />

• Construction Phase: These mitigation measures are applicable during site preparation and<br />

laying of the pipelines. They must be implemented by the relevant contractors and subcontractors.<br />

These mitigation measures are presented in Table 6-15.<br />

• Operations Phase: These mitigation measures are applicable during the long-term operation of<br />

the pipelines and must be implemented by the relevant <strong>Staatsolie</strong> management team. These<br />

mitigation measures are presented in Table 6-16.<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012