SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 13<br />

Two canals lie between the Staastolie refinery and the Suritex depot, viz. the Tout Lui Faut<br />

canal just north of the <strong>Staatsolie</strong> refinery and the Saramacca canal just north of the OGANE<br />

site. The Suriname River is used by a wide range of vessels of various sizes in this section.<br />

3.3 Description of the proposed project<br />

3.3.1 General description<br />

The project entails the construction of three underground pipelines between the <strong>Staatsolie</strong><br />

refinery at Tout Lui Faut in the south and the SOL-Beekhuizen and Suritex depots in the north,<br />

via the SOL-SUHOZA and OGANE sites, as per the specifications provided in Table 3-1:<br />

• One diesel and one gasoline pipeline will run between the <strong>Staatsolie</strong> refinery and the SOL<br />

and Suritex product storage depots, to convey diesel and gasoline from the <strong>Staatsolie</strong><br />

refinery to SOL and Suritex; and<br />

• One LPG pipeline will run between the <strong>Staatsolie</strong> refinery and OGANE, to convey LPG<br />

from OGANE to the <strong>Staatsolie</strong> refinery.<br />

Table 3-1: Proposed pipelines from <strong>Staatsolie</strong> Refinery<br />

Pipeline Between refinery and Diameter Pressure rating Pump capacity<br />

Diesel SOL and Suritex 10” 300 psi 2 000 bbl per hour<br />

Gasoline SOL and Suritex 8” 150 psi 750 bbl per hour<br />

LPG OGANE 4” 300 psi 4 tons per hour<br />

The three pipelines will follow a single alignment. In addition, a fibre optic cable will be<br />

installed alongside the pipelines.<br />

3.3.2 Pipeline alignment<br />

The pipeline will be laid underneath and just in-stream of the western bank of the Suriname<br />

River, using Horizontal Directional Drilling (HDD) (see Figure 3-2). Continuous sections of up<br />

to 1.64 km will be drilled. At the beginning and end of each drill section, an entry and/or exit<br />

point will be located at the surface, where the drill pad will be placed and from where the<br />

pipelines will be pulled into and out of the drill hole. At these points, the pipelines will lie<br />

approximately 3 m below the surface, while between entry and exit points the pipelines are<br />

expected to lie up to 30 m below the riverbed, depending on the HDD section and ground<br />

conditions, which will be finalised during detailed design.<br />

The pipeline will be laid in four drill sections with five entry and/or exit points, which are<br />

located:<br />

1. North of the Jules Wijdenbosch bridge;<br />

2. On the Bruynzeel site at the confluence of the Saramacca Canal and Suriname River,<br />

south of the Dalian company;<br />

3. On the riverbank near the SOL jetty in front of the OGANE property;<br />

4. On the riverbank between MNO Vervat and Kuldipsingh in front of the SEMC property;<br />

and<br />

5. On the riverbank adjacent to and north-east of the <strong>Staatsolie</strong> refinery (see Figure 3-1).<br />

From the exit near the SOL-Beekhuizen jetty, the LPG pipeline will be routed on land towards<br />

OGANE, and branches/offtakes of the diesel and gasoline pipelines will lead to SOL-<br />

Beekhuizen.<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!