SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 85<br />
Operations phase mitigation measures<br />
Aspect ID Mitigation measure / Procedure Responsible Implementation<br />
Timeframe<br />
Pipeline<br />
corridor<br />
management<br />
10. • Monitor compliance with any temporary and permanent<br />
restrictions to land and river use along the pipeline<br />
corridor.<br />
11. • Clearly mark all terrestrial areas to which temporary and<br />
permanent restrictions apply.<br />
12. • Routinely check areas where shallow sections of the<br />
pipelines are located for erosion, subsidence and<br />
exposure of the pipelines or protection plate.<br />
13. • Control vegetation in areas where shallow sections of the<br />
pipelines are located to prevent damage from roots.<br />
14. • Securely fence above-ground facilities associated with<br />
pipeline operations, if any.<br />
• <strong>Staatsolie</strong> Refining<br />
Operations Manager<br />
• Throughout operations • Visual inspection of<br />
corridor<br />
Monitoring Methods Performance Indicators<br />
• Number and type of<br />
activities within corridor<br />
that do not comply with<br />
requirements<br />
• Corrective actions<br />
undertaken<br />
REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012