SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 85<br />

Operations phase mitigation measures<br />

Aspect ID Mitigation measure / Procedure Responsible Implementation<br />

Timeframe<br />

Pipeline<br />

corridor<br />

management<br />

10. • Monitor compliance with any temporary and permanent<br />

restrictions to land and river use along the pipeline<br />

corridor.<br />

11. • Clearly mark all terrestrial areas to which temporary and<br />

permanent restrictions apply.<br />

12. • Routinely check areas where shallow sections of the<br />

pipelines are located for erosion, subsidence and<br />

exposure of the pipelines or protection plate.<br />

13. • Control vegetation in areas where shallow sections of the<br />

pipelines are located to prevent damage from roots.<br />

14. • Securely fence above-ground facilities associated with<br />

pipeline operations, if any.<br />

• <strong>Staatsolie</strong> Refining<br />

Operations Manager<br />

• Throughout operations • Visual inspection of<br />

corridor<br />

Monitoring Methods Performance Indicators<br />

• Number and type of<br />

activities within corridor<br />

that do not comply with<br />

requirements<br />

• Corrective actions<br />

undertaken<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012