20.09.2013 Views

concept EIA-rapport - Staatsolie

concept EIA-rapport - Staatsolie

concept EIA-rapport - Staatsolie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 6<br />

Title Objective Implementing agency Remarks<br />

Maritime Safety Law<br />

S.B. 2004 No. 90<br />

Drilling Law G.B.<br />

1952 no. 93<br />

Police Criminal Law<br />

G.B. 1915 no. 77 as<br />

amended<br />

Penal Code G.B.<br />

1911 no.1 as<br />

amended<br />

Provisions for safety of<br />

ships and harbours.<br />

Regulates drilling activities<br />

in Suriname.<br />

Contains many general<br />

environmental provisions<br />

with respect to public<br />

places, including waste<br />

disposal, noise, control of<br />

pests, hunting and fishing,<br />

water pollution, etc.<br />

Maritime Authority<br />

Suriname, Ministry of<br />

Trade and Industry,<br />

Maritime Safety Council<br />

GMD Drilling of liquid-containing layers<br />

should be done in a manner by<br />

which these liquids do not come<br />

in contact with both each other<br />

and other mineral depositions.<br />

Ministry of Justice and<br />

Police<br />

Ministry of Justice and<br />

Police<br />

OCCUPATIONAL HEALTH & SAFETY / LABOUR / PUBLIC HEALTH<br />

Occupational Safety<br />

Law G.B. 1947 no.<br />

142 as amended<br />

Labour Inspection<br />

Law S.B. 1983 no. 42<br />

Water Supply Law<br />

G.B. 1938 no. 33<br />

Movement of Goods<br />

Law S.B. 2003 no. 74<br />

Government Decree<br />

Resolution Negative<br />

List 2003 S.B. no. 74<br />

as amended by S.B.<br />

2006 no. 20<br />

To advance safety and<br />

hygiene in enterprises so<br />

that the chance of accidents<br />

and occupational diseases<br />

can be reduced to a<br />

minimum.<br />

Outlines the tasks and<br />

responsibilities of the<br />

Labour Inspector.<br />

Source: Adapted from SRK (2010).<br />

Establishes prohibitions with<br />

respect to water wells, etc.<br />

that serve as water supply<br />

sources.<br />

Provides general rules for<br />

international trade<br />

Regulates the international<br />

traffic of goods.<br />

In terms of Article 51 the polluting<br />

of a water source or water well is<br />

liable to a fine.<br />

In terms of Articles 224 and 225,<br />

contamination of water resources<br />

is penalised.<br />

Ministry of Labour 9 regulations have been issued<br />

for the implementation of this<br />

Law.<br />

Ministry of Labour In cases where the safety of<br />

persons is in danger, the<br />

Inspector has the authority to<br />

close the enterprise in question.<br />

MNH, Ministry of Public<br />

Health<br />

Ministry of Trade &<br />

Industry<br />

Ministry of Trade &<br />

Industry<br />

According to this Law the<br />

President is responsible for its<br />

implementation, but in practice<br />

the ministries assume the role.<br />

Import and export of chemical<br />

waste, pesticides, animals,<br />

mercury, radioactive materials,<br />

etc. are allowed with the approval<br />

of the Government.<br />

There is no formalised spatial land use planning or legislation in Suriname and as such no land<br />

use/zoning authorisations are required (Kasantaroeno, pers comm., cited in SRK, 2010).<br />

Agencies who will be involved in various approval or consultation processes applicable to this project<br />

are expected to include the:<br />

• Ministry of Labour, Technological Development and Environment (ATM) – which is responsible<br />

for the environment and the formulation of national environmental legislation and the supervision<br />

of compliance with employment protection and health and safety inspection regulations;<br />

• National Institute for Environmental Development in Suriname (NIMOS) – which is a technical<br />

division of ATM and the main environmental management and advisory body that administers<br />

the environmental permitting process in Suriname;<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!