SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 87<br />

Table 6-17: Measures recommended for decommissioning<br />

Aspect ID Measure / Procedure Responsible Implementation<br />

timeframe<br />

OPERATIONS PHASE<br />

Minimise<br />

decommissioning<br />

costs<br />

Determine<br />

decommissioning<br />

requirements<br />

1. • Ensure that the pipelines are well maintained. • <strong>Staatsolie</strong> Refining<br />

2. • Ensure that any spills are addressed and cleaned up<br />

immediately.<br />

Operations Manager<br />

3. • Keep maintenance and monitoring data to facilitate a review<br />

of the operational history of the pipelines to inform<br />

decommissioning.<br />

4. • Maintain an inventory of existing equipment and hazardous<br />

materials used. Use information on operational history to<br />

determine potentially contaminated areas.<br />

5. • Undertake soil and groundwater sampling where the<br />

possibility of contamination is suspected. Dispose of<br />

contaminated soil / mark contaminated areas appropriately.<br />

6. • Determine the potential ecological and health implications of<br />

contaminated areas and inform the relevant authorities<br />

accordingly.<br />

7. • Initiate consultation with key stakeholders (e.g. relevant<br />

authorities, affected landowners) before any planned<br />

decommissioning to discuss potential decommissioning<br />

options and methods.<br />

8. • Determine other potential commercial uses for the pipelines<br />

(and infrastructure) to be decommissioned (e.g. use for other<br />

products / by other operators).<br />

9. • Identify and assess any potential environmental and societal<br />

risks associated with the standard assumed method of<br />

decommissioning (removal of above-ground pipes and<br />

abandonment in situ of underground pipes).<br />

10. • Address potentially significant environmental and societal<br />

risks by amending the proposed method of decommissioning<br />

to prevent any significant adverse impacts.<br />

11. • Review operational history of the pipeline(s) to be<br />

decommissioned.<br />

• <strong>Staatsolie</strong> Refining<br />

Operations Manager<br />

• Throughout<br />

operations<br />

• Approximately 1<br />

year before planned<br />

decommissioning<br />

• Approximately 6<br />

months before<br />

planned<br />

decommissioning<br />

Monitoring methods Performance indicators<br />

• As per EMMP • As per EMMP<br />

• Regularly review that<br />

data and backups<br />

thereof are kept<br />

• Review inventory<br />

protocol and results<br />

• Review test protocol<br />

and results<br />

• Continuity of data<br />

• Number of areas<br />

investigated<br />

• Number of areas<br />

identified as polluted<br />

• Success of<br />

remediation<br />

• Cost of remediation<br />

• Review study • Risks identified<br />

• Monthly review of<br />

progress<br />

• Number of<br />

stakeholders notified<br />

• Completion of relevant<br />

milestones<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012