SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 87<br />
Table 6-17: Measures recommended for decommissioning<br />
Aspect ID Measure / Procedure Responsible Implementation<br />
timeframe<br />
OPERATIONS PHASE<br />
Minimise<br />
decommissioning<br />
costs<br />
Determine<br />
decommissioning<br />
requirements<br />
1. • Ensure that the pipelines are well maintained. • <strong>Staatsolie</strong> Refining<br />
2. • Ensure that any spills are addressed and cleaned up<br />
immediately.<br />
Operations Manager<br />
3. • Keep maintenance and monitoring data to facilitate a review<br />
of the operational history of the pipelines to inform<br />
decommissioning.<br />
4. • Maintain an inventory of existing equipment and hazardous<br />
materials used. Use information on operational history to<br />
determine potentially contaminated areas.<br />
5. • Undertake soil and groundwater sampling where the<br />
possibility of contamination is suspected. Dispose of<br />
contaminated soil / mark contaminated areas appropriately.<br />
6. • Determine the potential ecological and health implications of<br />
contaminated areas and inform the relevant authorities<br />
accordingly.<br />
7. • Initiate consultation with key stakeholders (e.g. relevant<br />
authorities, affected landowners) before any planned<br />
decommissioning to discuss potential decommissioning<br />
options and methods.<br />
8. • Determine other potential commercial uses for the pipelines<br />
(and infrastructure) to be decommissioned (e.g. use for other<br />
products / by other operators).<br />
9. • Identify and assess any potential environmental and societal<br />
risks associated with the standard assumed method of<br />
decommissioning (removal of above-ground pipes and<br />
abandonment in situ of underground pipes).<br />
10. • Address potentially significant environmental and societal<br />
risks by amending the proposed method of decommissioning<br />
to prevent any significant adverse impacts.<br />
11. • Review operational history of the pipeline(s) to be<br />
decommissioned.<br />
• <strong>Staatsolie</strong> Refining<br />
Operations Manager<br />
• Throughout<br />
operations<br />
• Approximately 1<br />
year before planned<br />
decommissioning<br />
• Approximately 6<br />
months before<br />
planned<br />
decommissioning<br />
Monitoring methods Performance indicators<br />
• As per EMMP • As per EMMP<br />
• Regularly review that<br />
data and backups<br />
thereof are kept<br />
• Review inventory<br />
protocol and results<br />
• Review test protocol<br />
and results<br />
• Continuity of data<br />
• Number of areas<br />
investigated<br />
• Number of areas<br />
identified as polluted<br />
• Success of<br />
remediation<br />
• Cost of remediation<br />
• Review study • Risks identified<br />
• Monthly review of<br />
progress<br />
• Number of<br />
stakeholders notified<br />
• Completion of relevant<br />
milestones<br />
REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012