25.10.2013 Views

On-Site Wastewater Treatment and Disposal Systems - Forced ...

On-Site Wastewater Treatment and Disposal Systems - Forced ...

On-Site Wastewater Treatment and Disposal Systems - Forced ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FIGURE 7-29<br />

RECOMMENDED MANIFOLD DIAMETERS FOR VARIOUS MANIFOLD LENGTHS, NUMBER OF LATERALS,<br />

AND LATERAL DISCHARGE RATES (FOR PLASTIC PIPE ONLY)<br />

MANIFOLD DIAMETER (IN)<br />

fold Length (ft)<br />

Cl...... ..,-.c r I *I- ’ 20 1 25 1 30 1 35 I 40 I 45 I 50 Flow per<br />

.-_a- . . ..&I_ P--*--l L”--:l-,A ’ Lateral<br />

1 Number of Laterals with End mi<br />

aComputed for plastic pipe only. The Hazer-r-Williams equation was used to compute headlosses<br />

through each segment (Hazen-Williams C = 150). The maximum manifold length for a given<br />

lateral discharge rate <strong>and</strong> spacing was defined as that length at which the difference<br />

between the heads at the distal <strong>and</strong> supply ends of the manifold exceeded 10 percent of the<br />

head at the distal end.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!