humidity, <strong>and</strong> the resulting net evaporation potential. Other features<br />

that affect performance include:<br />

1. Soil permeability (evaporation/infiltration only)--lagoon size<br />

<strong>and</strong> soil permeability are inversely proportional<br />

2. Salt accumulation (evaporation only)--results in decreased<br />

evaporation rate<br />

3. Hydraulic loading--size must accommodate peak flows<br />

4. Inlet configuration-- center inlet tends to improve mixing <strong>and</strong><br />

minimize odors<br />

5. Construction techniques<br />

7.3.3.4 Design<br />

Lagoons can be circular or rectangular. The maximum wastewater depth is<br />

normally 3 to 5 ft (0.9 to 1.5 m) with a freeboard of 2 or 3 ft, (0.6 to<br />

0.9 m), although depths greater than 8 ft (2.4 m) have also been used<br />

(42)(43)(44)(45)(46)(47). The minimum wastewater depth is generally 2<br />

ft (0.6 m). This may necessitate the addition of fresh water during<br />

high-evaporation summer months. Figure 7-37 shows the dimensional re-<br />

qujrements for a typical fnsite lagoon. The size ranges from 3 to 24<br />

ft /gpcd (0.07 to 0.57 m /lpcd), depending primarily on the type of<br />

lagoon (evaporation or evaporation/infiltration), soil permeability,<br />

climate, <strong>and</strong> local regulations.<br />

Lagoon design is usually based on locally available evaporation <strong>and</strong> pre-<br />

cipitation data, soil percolation rates (evaporation/infiltration only),<br />

<strong>and</strong> an assumed wastewater flow. Since runoff is excluded by the con-<br />

tainment berms, evaporation lagoons need only provide adequate surface<br />

area to evaporate the incident precipitation <strong>and</strong> the influent waste-<br />

water. Calculations may be made initially on an annual basis, but must<br />

then be checked to insure that adequate volume is provided for storage<br />

during periods when liquid inputs exceed evaporation. A brief design<br />

example is outlined below.<br />

Assumptions:<br />

1. Four occupants of home<br />

2. 45-gpcd wastewater flow<br />

3. Annual precipitation: 15.3 in.<br />

4. Annual evaporation: 46.7 in.<br />