<strong>Implementation</strong> <strong>Plan</strong> for the Global Observing System for Climate in Support of the UNFCCC<br />
(2010 Update)<br />
framework (see Action T1). The monitoring programmes are envisaged to involve the establishment of<br />
<strong>GCOS</strong>/GTOS baseline networks for river runoff and lake level and area. The National Hydrological<br />
Services are generally responsible for making the observations required by the different baseline<br />
networks, but often many other national and international agencies are involved. Further coordination<br />
within the hydrological domain is needed.<br />
Action T2<br />
Action: Achieve national recognition of the need to exchange hydrological data of all networks<br />
encompassed by GTN-H, in particular the <strong>GCOS</strong>/GTOS baseline networks, and facilitate the<br />
development of integrated hydrological products to demonstrate the value of these coordinated<br />
and sustained global hydrological networks.<br />
Who: GTN-H Coordinator, <strong>WMO</strong>, <strong>GCOS</strong>, GTOS, in consultation with GTN-H Partners.<br />
Time-Frame: Continuing; 2011 (demonstration products).<br />
Performance Indicator: Number of datasets available in International Data Centres; Number of<br />
available demonstration products.<br />
Annual Cost Implications: