GCOS Implementation Plan - WMO
GCOS Implementation Plan - WMO
GCOS Implementation Plan - WMO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Implementation</strong> <strong>Plan</strong> for the Global Observing System for Climate in Support of the UNFCCC<br />
(2010 Update)<br />
Action<br />
Action T3 120 [IP-04 T3, T29]<br />
Action: Development of a subset of current LTER and FLUXNET sites into a global terrestrial reference<br />
network for monitoring sites with sustained funding perspective, and collocated measurements of<br />
meteorological ECVs; seek linkage with Actions T4 and T29 as appropriate.<br />
Who: Parties’ national services and research agencies, FLUXNET organizations, NEON, and ICOS, in<br />
association with CEOS WGCV, CGMS-GSICS, and GTOS (TCO and TOPC).<br />
Time-frame: <strong>Implementation</strong> started by 2011, completed by 2014.<br />
Performance Indicator: <strong>Plan</strong> for the development and application of standardised protocols for the<br />
measurements of fluxes and state variables.<br />
Annual Cost Implications: 30-100M US$ (40% in non-Annex-I Parties).<br />
Action T4<br />
Action: Initiate an ecosystem monitoring network acquiring “Essential Ecosystem Records” (see section 3.8),<br />
by exploiting collocation opportunities with the global terrestrial reference network (Action T3) and the network<br />
of validation sites (T29).<br />
Who: Parties’ national services and research agencies, GTOS (Global Observation of Forest and Land Cover<br />
Dynamics (GOFC-GOLD)), TOPC, GEOBON, in association with the UNCBD.<br />
Time-frame: Network concept and observation approach by 2011; <strong>Implementation</strong> by 2014.<br />
Performance Indicator: Availability of essential ecosystem records, including proper documentation, from all<br />
designated sites in the network.<br />
Annual Cost Implications: 30-100M US$ (50% in non-Annex-I Parties).<br />
Action T5<br />
Action: Develop an experimental evaporation product from existing networks and satellite observations.<br />
Who: Parties, national services, research groups through GTN-H, IGWCO, TOPC, GEWEX Land Flux Panel<br />
and WCRP CliC.<br />
Time frame: 2013-2015.<br />
Performance indicator: Availability of a validated global satellite product of total evaporation.<br />
Annual Cost Implications: 1-10M US$ (10% in non-Annex-I Parties).<br />
Action T6 [IP-04 T4]<br />
Action: Confirm locations of GTN-R sites, determine operational status of gauges at all GTN-R sites, and<br />
ensure that the GRDC receive daily river discharge data from all priority reference sites within one year of their<br />
observation (including measurement and data transmission technology used).<br />
Who: National Hydrological Services, through <strong>WMO</strong> CHy in cooperation with TOPC, GTOS and the GRDC.<br />
Time-Frame: 2011.<br />
Performance Indicator: Reports to <strong>WMO</strong> CHy on the completeness of the GTN-R record held in the GRDC<br />
including the number of stations and nations submitting data to the GRDC, National Communication to<br />
UNFCCC.<br />
Annual Cost Implications: 1-10M US$ (60% in non-Annex-I Parties).<br />
Action T7<br />
Action: Assess national needs for river gauges in support of impact assessments and adaptation, and<br />
consider the adequacy of those networks.<br />
Who: National Hydrological Services, in collaboration with <strong>WMO</strong> CHy and TOPC.<br />
Time-Frame: 2014.<br />
Performance Indicator: National needs identified; options for implementation explored.<br />
Annual Cost Implication: 10-30M US$ (80% in non-Annex-I Parties).<br />
Action T8 [IP-04 T6]<br />
Action: Submit weekly/monthly lake level/area data to the International Data Centre; submit weekly/monthly<br />
altimeter-derived lake levels by space agencies to HYDROLARE.<br />
Who: National Hydrological Services through <strong>WMO</strong> CHy, and other institutions and agencies providing and<br />
holding data; space agencies; HYDROLARE.<br />
Time-Frame: 90% coverage of available data from GTN-L by 2012.<br />
Performance Indicator: Completeness of database.<br />
Annual Cost Implications: 1-10M US$ (40% in non-Annex-I Parties).<br />
Action T9 [IP-04 T7]<br />
Action: Submit weekly/monthly lake level and area data measured during the 19 th and 20 th centuries for the<br />
GTN-L lakes to HYDROLARE.<br />
Who: National Hydrological Services and other agencies providing and holding data, in cooperation with <strong>WMO</strong><br />
CHy and HYDROLARE.<br />
Time-Frame: Completion of archive by 2012.<br />
Performance Indicator: Completeness of database.<br />
Annual Cost Implications: