GCOS Implementation Plan - WMO
GCOS Implementation Plan - WMO
GCOS Implementation Plan - WMO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Implementation</strong> <strong>Plan</strong> for the Global Observing System for Climate in Support of the UNFCCC<br />
(2010 Update)<br />
Action<br />
Action O15 [IP-04 O18]<br />
Action: Implement continuity of ocean colour radiance datasets through the plan for an Ocean Colour<br />
Radiometry Virtual Constellation.<br />
Who: CEOS space agencies, in consultation with IOCCG and GEO.<br />
Time-Frame: Implement plan as accepted by CEOS agencies in 2009.<br />
Performance Indicator: Global coverage with consistent sensors operating according to the GCMPs; flow of<br />
data into agreed archives.<br />
Annual Cost Implications: 30-100M US$ (10% in non-Annex-I Parties).<br />
Action O16 [IP-04 O19]<br />
Action: Implement a wave measurement component as part of the Surface Reference Mooring Network.<br />
Who: Parties operating moorings, coordinated through the JCOMM Expert Team on Waves and Surges.<br />
Time-Frame: Deployed by 2014.<br />
Performance Indicator: Sea state measurement in the International Data Centres.<br />
Annual Cost Implications: 1-10M US$ (Mainly by Annex-I Parties).<br />
Action O17 118 [IP-04 O20]<br />
Action: Establish an international group to assemble surface drifting buoy motion data, ship drift current<br />
estimates, current estimates based on wind stress and surface topography fields; prepare an integrated<br />
analysis of the surface current field.<br />
Who: OOPC will work with JCOMM and WCRP.<br />
Time-Frame: 2014.<br />
Performance Indicator: Number of global current fields available routinely.<br />
Annual Cost Implications: