GCOS Implementation Plan - WMO
GCOS Implementation Plan - WMO
GCOS Implementation Plan - WMO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Implementation</strong> <strong>Plan</strong> for the Global Observing System for Climate in Support of the UNFCCC<br />
(2010 Update)<br />
Action<br />
Action C14<br />
Action: Improving data holdings in International Data Centres (IDCs).<br />
Who: IDCs to send details of their data possessions to each of the Parties. The Parties to respond back to the<br />
IDCs about the quality and quantity of the data and ensure that the IDCs hold all available data.<br />
Time-Frame: Complete by 2014.<br />
Performance Indicator: Percentage of responses from Parties.<br />
Annual Cost Implications: 10-30M US$ (60% in non-Annex-I Parties).<br />
Action C15 [IP-04 C15]<br />
Action: Undertake research initiatives to acquire high-resolution proxy climate data by extending spatial<br />
coverage into new regions, extending temporal coverage back in time and exploiting new sources.<br />
Who: Parties’ national research programmes in cooperation with WCRP and IGBP.<br />
Time-Frame: Continuing.<br />
Performance Indicator: Reports in scientific literature.<br />
Annual Cost Implications: 10-30M US$ (60% in non-Annex-I Parties).<br />
Action C16 [IP-04 C16]<br />
Action: Improve synthesis of proxy climate and proxy environmental data on multi-decadal to millennial time<br />
scales, including better chronologies for existing records, particularly from the Tropics, Asia, the Southern<br />
Hemisphere and the Southern Ocean.<br />
Who: Parties’ national research programmes in cooperation with WCRP and IGBP.<br />
Time-Frame: Continuing.<br />
Performance Indicator: Reports in scientific literature.<br />
Annual Cost Implications: 10-30M US$ (80% in non-Annex-I Parties).<br />
Action C17 [IP-04 C17]<br />
Action: Preserve proxy climate and proxy environmental data (both the original measurements as well as<br />
the final reconstructions) in archival databases.<br />
Who: World Data Centre for Paleoclimatology in cooperation with national research programmes.<br />
Time-Frame: Continuing.<br />
Performance Indicator: Completeness of archival databases and availability of data to the research<br />
community through International Data Centres.<br />
Annual Cost Implications: 1-10M US$ (30% in non-Annex-I Parties).<br />
Action C18<br />
Action: Apply standards and procedures for metadata and its storage and exchange.<br />
Who: Operators of <strong>GCOS</strong> related systems, including data centres.<br />
Time-Frame: Initial implementation of the operational WIS and GEOSS systems is occurring in 2010,<br />
implementations will be ongoing thereafter.<br />
Performance Indicator: Number of ECV related datasets accessible through standard mechanisms.<br />
Annual Cost Implications: