02.05.2014 Views

GCOS Implementation Plan - WMO

GCOS Implementation Plan - WMO

GCOS Implementation Plan - WMO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Implementation</strong> <strong>Plan</strong> for the Global Observing System for Climate in Support of the UNFCCC<br />

(2010 Update)<br />

Action<br />

Action T40 [IP-04 T36]<br />

Action: Revision of TEMS with improved focus on the monitoring of terrestrial ECVs.<br />

Who: Parties’ national services and research programmes contributing to TEMS, in cooperation with GTOS,<br />

GOSIC, and GCMD, and in consultation with the <strong>GCOS</strong> Secretariat.<br />

Time-Frame: By 2012.<br />

Performance Indicator: Improvement of site coverage measuring terrestrial ECVs.<br />

Annual Cost Implications: 1-10M US$ (Mainly by Annex-I Parties).<br />

Cost<br />

Category<br />

In national<br />

territories<br />

of estimated additional annual cost for implementing the Actions in this <strong>Plan</strong> (cf.<br />

Figure 2) related to:<br />

• Enhancements in national territories (Annex-I Parties): 521 M US$/year<br />

• Enhancements in national territories (non-Annex-I Parties): 583 M US$/year<br />

• Open ocean in situ observations: 361 M US$/year<br />

• Satellite missions, datasets and products: 991 M US$/year<br />

TOTAL<br />

2456 M US$/year<br />

Sum 122<br />

122 Estimates assume average costs in million (M) US dollars of 0.5M (for

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!