- Page 1:
Lockout / Tagout Class Agenda and O
- Page 4 and 5:
Lockout / Tagout Course Objectives
- Page 6:
Activity Plan q Activity Other peop
- Page 9 and 10:
The following accidents, taken from
- Page 11 and 12:
V. Identify Different Personnel u A
- Page 13 and 14:
XI. Miscellaneous Items in Your Pro
- Page 15 and 16:
2-8
- Page 17 and 18:
2-10
- Page 19 and 20:
2-12
- Page 21 and 22:
2-14
- Page 23 and 24:
2-16
- Page 25:
2-18
- Page 28 and 29:
OSHA Regulations (Standards - 29 CF
- Page 30 and 31:
(a)(3) "Purpose." (a)(3)(i) This se
- Page 32 and 33:
(c)(2) "Lockout/tagout." (c)(2)(i)
- Page 34 and 35:
(c)(5)(ii) Lockout devices and tago
- Page 36 and 37:
(c)(7)(i)(A) Each authorized employ
- Page 38 and 39:
(d)(2) (d)(3) (d)(4) "Machine or eq
- Page 40 and 41:
(e)(3)(ii) Making all reasonable ef
- Page 42 and 43:
OSHA Regulations (Standards - 29 CF
- Page 44:
(7) Ensure that the equipment is di
- Page 47 and 48:
III. Definitions Authorized employe
- Page 49 and 50:
D. Lockout Device Application. 1. A
- Page 51 and 52:
3. Ensure that our employees unders
- Page 53 and 54:
APPENDIX A TAGOUT PROCEDURES A. Whe
- Page 55 and 56:
DATE: _____/_____/_____ APPENDIX C
- Page 57 and 58:
APPENDIX E ENERGY SOURCE EVALUATION
- Page 59 and 60:
2 of 3 APPENDIX F 5. A. Apply locks
- Page 61 and 62:
APPENDIX G-1 “Authorized” Emplo
- Page 63 and 64:
APPENDIX G-3 “Other” Employee T
- Page 65 and 66:
HAZARDOUS ENERGY CONTROL PROCEDURES
- Page 67 and 68:
Appendix I Audit Checklist Review t
- Page 69:
Yes No Before the machinery is acti
- Page 72 and 73:
Additional Training for Qualified P
- Page 74 and 75:
Employer Responsibilities (continue
- Page 76 and 77:
Preventing Shock • Safety Plannin
- Page 79 and 80:
OSHA Regulations (Standards - 29 CF
- Page 81 and 82:
(c)(2) (c)(3) (c)(4) Communications
- Page 83 and 84:
(b)(3)(ii) The skills and technique
- Page 85 and 86:
The work practices that are used sh
- Page 87 and 88:
equivalent to that obtained by use
- Page 89 and 90:
Note: The work practices used by qu
- Page 91 and 92:
(c)(3)(iii)(B)(2) The equipment is
- Page 94 and 95:
OSHA Standards Interpretation and C
- Page 96 and 97:
[01/07/1992] Electrical safety rela
- Page 98 and 99:
guards and/or devices assure employ
- Page 100 and 101:
OSHA Standards Interpretation and C
- Page 102 and 103:
OSHA Standards Interpretation and C
- Page 104 and 105:
OSHA Standards Interpretation and C
- Page 106 and 107:
contradict the guidance provided in
- Page 108 and 109:
• Verification is provided by a s
- Page 110 and 111:
Question: Reply: Would interlocking
- Page 113 and 114:
The following document is reproduce
- Page 116 and 117:
WHY THIS LOCKOUT IMPLEMENTATION KIT
- Page 118 and 119:
LOCKOUT STANDARD CHRONOLOGY Februar
- Page 120 and 121:
6. Industry sectors, such as constr
- Page 122 and 123:
f. Each element of this program wil
- Page 124 and 125:
h. Locks shall be attached to each
- Page 126 and 127:
Training records such as attendance
- Page 128 and 129:
(b) (c) (d) (e) (f) Machinery equip
- Page 130 and 131:
(iv) Prior to lockout device remova
- Page 132 and 133:
APPENDIX A - SAMPLE FORMS Form No.
- Page 134 and 135:
Form No.2 WRITTEN PROCEDURE ELEMENT
- Page 136 and 137:
Are alternate energy control method
- Page 138 and 139:
Is procedure adequate? ____________
- Page 140 and 141:
Is job procedure for removal being
- Page 142 and 143:
11. Have attempts been made to cont
- Page 144 and 145:
Document No- 1 PLANNING FOR TRAININ
- Page 146 and 147:
8. The retraining must reestablish
- Page 148: appropriate, to determine whether e
- Page 152: One Hour Safety Presentation The ma
- Page 156: Elements of a Lockout/Tagout Progra
- Page 160: Identify Different Personnel u Auth
- Page 164: List & Identify all Sources Of Ener
- Page 168: Procedures For Each Piece Of u Writ
- Page 172: Training Affected & Other Employees
- Page 176: Develop Procedures On How You Will
- Page 180: Miscellaneous Items in Your Program
- Page 184: Other Things To Consider u When do
- Page 188: Elements of a Lockout/Tagout Progra
- Page 192: Identify Different Personnel u Auth
- Page 196: List & Identify all Sources Of Ener
- Page 202: Lockout / Tagout Energy Source Iden
- Page 206: Shift & Personnel Changes u How to
- Page 210: Group Lockout Procedures Procedures
- Page 214: Annual Inspection of Your Procedure
- Page 218: Frequently Asked Questions The stan
- Page 222: • It is designed with any other i
- Page 226: Elements of a Lockout/Tagout Progra
- Page 230: Procedures For Each Piece Of Equipm
- Page 234: Miscellaneous Items in Your Program
- Page 237 and 238: Additional Resources for Lockout/Ta
- Page 239 and 240: GENERAL INTERNET WEB SITES FOR OCCU
- Page 241 and 242: http://www.epa.state.oh.us 3 At the