- Page 1:
Lockout / Tagout Class Agenda and O
- Page 4 and 5:
Lockout / Tagout Course Objectives
- Page 6:
Activity Plan q Activity Other peop
- Page 9 and 10:
The following accidents, taken from
- Page 11 and 12:
V. Identify Different Personnel u A
- Page 13 and 14:
XI. Miscellaneous Items in Your Pro
- Page 15 and 16:
2-8
- Page 17 and 18:
2-10
- Page 19 and 20: 2-12
- Page 21 and 22: 2-14
- Page 23 and 24: 2-16
- Page 25: 2-18
- Page 28 and 29: OSHA Regulations (Standards - 29 CF
- Page 30 and 31: (a)(3) "Purpose." (a)(3)(i) This se
- Page 32 and 33: (c)(2) "Lockout/tagout." (c)(2)(i)
- Page 34 and 35: (c)(5)(ii) Lockout devices and tago
- Page 36 and 37: (c)(7)(i)(A) Each authorized employ
- Page 38 and 39: (d)(2) (d)(3) (d)(4) "Machine or eq
- Page 40 and 41: (e)(3)(ii) Making all reasonable ef
- Page 42 and 43: OSHA Regulations (Standards - 29 CF
- Page 44: (7) Ensure that the equipment is di
- Page 47 and 48: III. Definitions Authorized employe
- Page 49 and 50: D. Lockout Device Application. 1. A
- Page 51 and 52: 3. Ensure that our employees unders
- Page 53 and 54: APPENDIX A TAGOUT PROCEDURES A. Whe
- Page 55 and 56: DATE: _____/_____/_____ APPENDIX C
- Page 57 and 58: APPENDIX E ENERGY SOURCE EVALUATION
- Page 59 and 60: 2 of 3 APPENDIX F 5. A. Apply locks
- Page 61 and 62: APPENDIX G-1 “Authorized” Emplo
- Page 63 and 64: APPENDIX G-3 “Other” Employee T
- Page 65 and 66: HAZARDOUS ENERGY CONTROL PROCEDURES
- Page 67 and 68: Appendix I Audit Checklist Review t
- Page 69: Yes No Before the machinery is acti
- Page 73 and 74: Safety Related Work Practices to wh
- Page 75 and 76: Personal Protective Equipment • F
- Page 77: Preventing Shock • Never take the
- Page 80 and 81: (c) (c)(1) Excluded work by qualifi
- Page 82 and 83: OSHA Regulations (Standards - 29 CF
- Page 84 and 85: OSHA Regulations (Standards - 29 CF
- Page 86 and 87: (b)(2)(ii)(A) Safe procedures for d
- Page 88 and 89: (b)(2)(v)(B) Employees exposed to t
- Page 90 and 91: TABLE S-5 - APPROACH DISTANCES FOR
- Page 92: (c)(8) (c)(9) "Conductive apparel."
- Page 95 and 96: [09/19/1995] Certain provisions of
- Page 97 and 98: OSHA Standards Interpretation and C
- Page 99 and 100: OSHA Standards Interpretation and C
- Page 101 and 102: with all affected employees, as def
- Page 103 and 104: OSHA Standards Interpretation and C
- Page 105 and 106: August 21, 1995 John B. Miles, Jr.
- Page 107 and 108: OSHA Standards Interpretation and C
- Page 109 and 110: OSHA Standards Interpretation and C
- Page 111: 7-18
- Page 114: 8-2
- Page 117 and 118: DATES MILESTONES LOCKOUT RELATED FA
- Page 119 and 120: Strengths ANALYSIS OF OSHA LOCKOUT
- Page 121 and 122:
ENERGY CONTROL PROGRAM 1. COMPANY N
- Page 123 and 124:
The duties of the lockout committee
- Page 125 and 126:
c. Content of Written Procedures. W
- Page 127 and 128:
Representative, Bargaining Committe
- Page 129 and 130:
1. General. An abandoned lockout de
- Page 131 and 132:
TO BE COMPLETED UPON INITIAL ASSIGN
- Page 133 and 134:
Form No.1 ENERGY CONTROL DEVICE SUR
- Page 135 and 136:
Form No.3 POSTED PROCEDURE CHECKLIS
- Page 137 and 138:
Form No. 4 LOCKOUT APPLICATION INSP
- Page 139 and 140:
Form No. 5 LOCKOUT REMOVAL INSPECTI
- Page 141 and 142:
Form No.6 ABANDONED LOCKOUT DEVICE
- Page 143 and 144:
APPENDIX B - TRAINING PROGRAM SUGGE
- Page 145 and 146:
SUGGESTED TRAINING PROGRAM LANGUAGE
- Page 147 and 148:
Document No. 3 SUGGESTED TRAINING P
- Page 150:
ONE HOUR LOCKOUT TAGOUT MODULE We t
- Page 154:
Transparency Masters
- Page 158:
Lockout Devices u Standardize All L
- Page 162:
Training Of Authorized Employees u
- Page 166:
Safe Procedures for Energy Control
- Page 170:
Lockout / Tagout Energy Source Iden
- Page 174:
Shift & Personnel Changes u How to
- Page 178:
Group Lockout Procedures Procedures
- Page 182:
Annual Inspection of Your Procedure
- Page 186:
Instructor Notes
- Page 190:
Lockout Devices u Standardize All L
- Page 194:
Training Of Authorized Employees u
- Page 198:
Safe Procedures for Energy Control
- Page 202:
Lockout / Tagout Energy Source Iden
- Page 206:
Shift & Personnel Changes u How to
- Page 210:
Group Lockout Procedures Procedures
- Page 214:
Annual Inspection of Your Procedure
- Page 218:
Frequently Asked Questions The stan
- Page 222:
• It is designed with any other i
- Page 226:
Elements of a Lockout/Tagout Progra
- Page 230:
Procedures For Each Piece Of Equipm
- Page 234:
Miscellaneous Items in Your Program
- Page 237 and 238:
Additional Resources for Lockout/Ta
- Page 239 and 240:
GENERAL INTERNET WEB SITES FOR OCCU
- Page 241 and 242:
http://www.epa.state.oh.us 3 At the