- Page 1: Lockout / Tagout Class Agenda and O
- Page 5 and 6: Lockout/Tagout and Safety-Related W
- Page 8 and 9: Elements of a Lockout/Tagout Progra
- Page 10 and 11: III. Procedures For Each Piece Of E
- Page 12 and 13: VIII. Training Affected & Other Emp
- Page 14 and 15: XIV. Other Things To Consider. u Wh
- Page 16 and 17: Other Part 1910 Regulations With Lo
- Page 18 and 19: The following accidents, taken from
- Page 20 and 21: The following accidents, taken from
- Page 22 and 23: Lockout / Tagout Energy Source Iden
- Page 24 and 25: Lockout/Tagout Energy Source Identi
- Page 27 and 28: OSHA Regulations (Standards - 29 CF
- Page 29 and 30: (a)(2)(i) This standard applies to
- Page 31 and 32: "Hot tap." A procedure used in the
- Page 33 and 34: Note: "Exception:" The employer nee
- Page 35 and 36: (c)(5)(iii) Tagout devices shall wa
- Page 37 and 38: (c)(7)(iii) Employee retraining. (c
- Page 39 and 40: (d)(5)(ii) If there is a possibilit
- Page 41 and 42: (f)(3) "Group lockout or tagout." (
- Page 43 and 44: Compliance With This Program All em
- Page 46 and 47: Sample Program Hazardous Energy Con
- Page 48 and 49: personnel. Lockout will also apply
- Page 50 and 51: VIII. Additional Requirements A. In
- Page 52 and 53:
Retraining will re-establish employ
- Page 54 and 55:
APPENDIX B LIST OF AUTHORIZED LOCKO
- Page 56 and 57:
DATE: _____/_____/_____ APPENDIX D
- Page 58 and 59:
1 OF 3 APPENDIX F SPECIFIC ENERGY C
- Page 60 and 61:
3 of 3 APPENDIX F 3. Notify all aff
- Page 62 and 63:
APPENDIX G-2 “Affected” Employe
- Page 64 and 65:
APPENDIX H Periodic Inspection Cert
- Page 66 and 67:
THE CONTROL OF HAZARDOUS ENERGY (LO
- Page 68 and 69:
Yes No Is the locking out of contro
- Page 71 and 72:
ELECTRICAL SAFETY-RELATED WORK PRAC
- Page 73 and 74:
Safety Related Work Practices to wh
- Page 75 and 76:
Personal Protective Equipment • F
- Page 77:
Preventing Shock • Never take the
- Page 80 and 81:
(c) (c)(1) Excluded work by qualifi
- Page 82 and 83:
OSHA Regulations (Standards - 29 CF
- Page 84 and 85:
OSHA Regulations (Standards - 29 CF
- Page 86 and 87:
(b)(2)(ii)(A) Safe procedures for d
- Page 88 and 89:
(b)(2)(v)(B) Employees exposed to t
- Page 90 and 91:
TABLE S-5 - APPROACH DISTANCES FOR
- Page 92:
(c)(8) (c)(9) "Conductive apparel."
- Page 95 and 96:
[09/19/1995] Certain provisions of
- Page 97 and 98:
OSHA Standards Interpretation and C
- Page 99 and 100:
OSHA Standards Interpretation and C
- Page 101 and 102:
with all affected employees, as def
- Page 103 and 104:
OSHA Standards Interpretation and C
- Page 105 and 106:
August 21, 1995 John B. Miles, Jr.
- Page 107 and 108:
OSHA Standards Interpretation and C
- Page 109 and 110:
OSHA Standards Interpretation and C
- Page 111:
7-18
- Page 114:
8-2
- Page 117 and 118:
DATES MILESTONES LOCKOUT RELATED FA
- Page 119 and 120:
Strengths ANALYSIS OF OSHA LOCKOUT
- Page 121 and 122:
ENERGY CONTROL PROGRAM 1. COMPANY N
- Page 123 and 124:
The duties of the lockout committee
- Page 125 and 126:
c. Content of Written Procedures. W
- Page 127 and 128:
Representative, Bargaining Committe
- Page 129 and 130:
1. General. An abandoned lockout de
- Page 131 and 132:
TO BE COMPLETED UPON INITIAL ASSIGN
- Page 133 and 134:
Form No.1 ENERGY CONTROL DEVICE SUR
- Page 135 and 136:
Form No.3 POSTED PROCEDURE CHECKLIS
- Page 137 and 138:
Form No. 4 LOCKOUT APPLICATION INSP
- Page 139 and 140:
Form No. 5 LOCKOUT REMOVAL INSPECTI
- Page 141 and 142:
Form No.6 ABANDONED LOCKOUT DEVICE
- Page 143 and 144:
APPENDIX B - TRAINING PROGRAM SUGGE
- Page 145 and 146:
SUGGESTED TRAINING PROGRAM LANGUAGE
- Page 147 and 148:
Document No. 3 SUGGESTED TRAINING P
- Page 150:
ONE HOUR LOCKOUT TAGOUT MODULE We t
- Page 154:
Transparency Masters
- Page 158:
Lockout Devices u Standardize All L
- Page 162:
Training Of Authorized Employees u
- Page 166:
Safe Procedures for Energy Control
- Page 170:
Lockout / Tagout Energy Source Iden
- Page 174:
Shift & Personnel Changes u How to
- Page 178:
Group Lockout Procedures Procedures
- Page 182:
Annual Inspection of Your Procedure
- Page 186:
Instructor Notes
- Page 190:
Lockout Devices u Standardize All L
- Page 194:
Training Of Authorized Employees u
- Page 198:
Safe Procedures for Energy Control
- Page 202:
Lockout / Tagout Energy Source Iden
- Page 206:
Shift & Personnel Changes u How to
- Page 210:
Group Lockout Procedures Procedures
- Page 214:
Annual Inspection of Your Procedure
- Page 218:
Frequently Asked Questions The stan
- Page 222:
• It is designed with any other i
- Page 226:
Elements of a Lockout/Tagout Progra
- Page 230:
Procedures For Each Piece Of Equipm
- Page 234:
Miscellaneous Items in Your Program
- Page 237 and 238:
Additional Resources for Lockout/Ta
- Page 239 and 240:
GENERAL INTERNET WEB SITES FOR OCCU
- Page 241 and 242:
http://www.epa.state.oh.us 3 At the