Comments in white are satisfied.<br />

Comments in orange background are not satisfied or are new comments.<br />

Comments in blue background can be addressed at the NFSSR stage.<br />

Comments in yellow are deferred due to need for hydrology model.<br />

APPENDIX A. TRCA COMMENTS ON SEATON MESPA DECEMBER 2011; MESPA TEAM RESPONSE FEBRUARY 2013<br />

# Section #<br />

Page # in<br />

PDF TRCA Comment Action Required<br />

94. SWMF #10 846 Erosion implications <strong>of</strong> outletting a SWMF to a Province to provide direction with regard to species<br />

headwater tributary. This is a redside dace at risk.<br />

tributary.<br />

95. SWMF #11 847 Why does the fisheries setback extend onto the<br />

development lands? What are the erosion<br />

implications <strong>of</strong> outletting to the intermittent<br />

tributary. This is a redside dace tributary.<br />

96. SWMF #12 848 Encroaches on CUT1-E, which is a thicket<br />

community. Proposing to outlet to small tributary.<br />

Is it better to outlet to larger system and take ro<strong>of</strong><br />

water to top <strong>of</strong> tributary? This is a redside dace<br />

tributary.<br />

97. SWMF #13 849 Butternut in vicinity and this is a redside dace<br />

tributary.<br />

98. SWMF #14 850 Issues with SWMF outlet and wetland water<br />

balance.<br />

Provide rationale for fisheries setback and provide<br />

erosion assessment. Province to provide direction<br />

with regard to species at risk.<br />

Relocate SMWF to avoid thicket communities.<br />

Provide analysis for watercourse. Province to<br />

provide direction with regard to species at risk<br />

Province to provide direction with regard to species<br />

at risk.<br />

Consulting Team’s Response<br />

April 27, 2011<br />

An overall benefit plan for redside dace is being<br />

prepared, and a workshop will be held with<br />

TRCA and MNR to discuss.<br />

As the MESP team was not involved in the<br />

establishment <strong>of</strong> the NHS, we can provide no<br />

insight as to why the 30 m fisheries setback falls<br />

outside the NHS.<br />

An overall benefit plan for redside dace is being<br />

prepared, and a workshop held with TRCA and<br />

MNR.<br />

The erosion assessment will be completed in the<br />

NFSSR.<br />

The natural heritage conditions in the location <strong>of</strong><br />

the proposed pond block are being evaluated<br />

further in the MESPA and a headwater feature<br />

water balance is being undertaken.<br />

All areas are being investigated for butternuts in<br />

the NFSSRs. An overall benefit plan for redside<br />

dace is being prepared, and a workshop will be<br />

held with TRCA and MNR to discuss.<br />

Action Taken<br />

MESPA December 2011<br />

The basis for an overall benefit plan and/or<br />

mitigation plan for redside dace and a fisheries<br />

compensation plan are included in the MESPA,<br />

<strong>Chapter</strong>s E and F.<br />

Mitigation is required for all outlets – as required by<br />

the legislation.<br />

The basis for an overall benefit plan and/or<br />

mitigation plan for redside dace and a fisheries<br />

compensation plan are included in the MESPA,<br />

<strong>Chapter</strong>s E and F.<br />

SWMF#12 is relocated and the matrix for this<br />

SWMF is revised.<br />

The basis for an overall benefit plan and/or<br />

mitigation plan for redside dace and a fisheries<br />

compensation plan are included in the MESPA.<br />

Butternut is also addressed. See <strong>Chapter</strong> E.<br />

See earlier comments regarding G4a, b, and c. Under review. The water balance for Wetlands G4a, G4b, G4c<br />

have been reassessed, and required mitigations<br />

provided.<br />

TRCA Comment on MESPA<br />

Please confirm that the appropriate length to<br />

width ratio can be achieved<br />

The direction <strong>of</strong> flow in the pond is opposite to<br />

the prevailing grade; please confirm that grading<br />

within the block provided is possible. The<br />

groundwater table is a potential constraint and<br />

must be further investigated at the NFSSR stage<br />

to confirm pond location/site grading. The pond<br />

is not at the bottom end <strong>of</strong> the site - is it in the<br />

optimal location and can site grading be<br />

completed to make this pond location work?<br />

Please confirm that all drainage can be safely<br />

conveyed across/under Taunton Road to the<br />

pond, in meeting with municipal/regional<br />

standards.<br />

Please confirm that an appropriate length to<br />

width ratio can be achieved. The pond is<br />

expected to be constructed within the GW table<br />

and requires further investigation.<br />

TRCA agrees with the note that a grading<br />

assessment needs to address the 9m elevation<br />

difference within the pond. This is a major issue<br />

impacting this pond location, and it should be<br />

addressed at the MESPA stage.<br />

Please confirm that the entire drainage area can<br />

be directed to the north end <strong>of</strong> the pond given<br />

the existing topography. Please confirm that all<br />

drainage can be safely conveyed across/under<br />

proposed roadways to the pond (meeting<br />

municipal/regional standards). The pond is<br />

expected to be constructed within the GW table<br />

and requires further investigation.<br />

Noted. Construction impacts associated with the<br />

outfall will need to be minimized by utilizing the<br />

unopened road allowance.<br />

Team Response<br />

February 2013<br />

Comment acknowledged. To be addressed<br />

in NFSSR for Neighbourhood 16.<br />

Comments acknowledged. To be<br />

addressed in NFSSR for Neighbourhood<br />

16.<br />

Comments acknowledged. It is noted that<br />

the elimination <strong>of</strong> this facility is being<br />

investigated in the NFSSR for<br />

Neighbourhood 16.<br />

The NFSSR has advanced the grading and<br />

has shown that this can be accomplished.<br />

(refer to NFSSR for Neighbourhood 16 for<br />

details on grading and drainage).<br />

The groundwater constraint (high water<br />

table) was identified in the SWM matrix in<br />

the MESPA along with the need for further<br />

investigation at the NFSSR stage.<br />

Comments acknowledged. To be<br />

addressed in NFSSR for Neighbourhood<br />

16.<br />

99. SWMF #15 851 Forest cover will be lost here. Provide edge management at NFSSR stage. SWMF is located entirely with the development<br />

limits and the existing street precludes the need<br />

for edge management.<br />

100. SWMF #16 852 Impacts to thicket community. Relocate SMWF to avoid thicket communities. The SWMF location with respect to the thicket is<br />

being evaluated.<br />

No action required.<br />

Edge management s not required as the ‘edge’ <strong>of</strong><br />

the retained forest cover is to the west <strong>of</strong> an<br />

existing road (Forbrock Street) and will not be<br />

affected.<br />

SWMF#16 has been moved and no longer impacts<br />

the thicket community. The MESPA matrix for this<br />

SWMF is revised.<br />

The pond is expected to be constructed within<br />

the GW table and requires further investigation.<br />

Confirm that intent <strong>of</strong> outlet is to discharge<br />

downstream <strong>of</strong> G4a, which may be hydraulically<br />

connected to wetland area on reach GA7.<br />

Groundwater issues should be investigated as<br />

soon as possible. Grading appears awkward for<br />

this site given the size <strong>of</strong> the pond, and chosen<br />

location does not appear to be at low point on<br />

site.<br />

Further discussion on this SWM pond location is<br />

needed once the road alignment is finalized.<br />

Confirm that the pond block is 7% <strong>of</strong> the<br />

drainage area - appears small. Please confirm<br />

that the appropriate length to width ratio can be<br />

achieved. The pond is expected to be<br />

Comments acknowledged. To be<br />

addressed in NFSSR for Neighbourhood<br />

17.<br />

Comments acknowledged. To be<br />

addressed in NFSSR for Neighbourhood<br />

18.<br />

PAGE 24 February 2013