Comments in white are satisfied.<br />

Comments in orange background are not satisfied or are new comments.<br />

Comments in blue background can be addressed at the NFSSR stage.<br />

Comments in yellow are deferred due to need for hydrology model.<br />

APPENDIX A. TRCA COMMENTS ON SEATON MESPA DECEMBER 2011; MESPA TEAM RESPONSE FEBRUARY 2013<br />

# Section #<br />

Page # in<br />

PDF TRCA Comment Action Required<br />

be shifted so that it is outside the NHS buffer.<br />

128. 7.1 1123 TRCA will need to view all new crossing locations<br />

in the field prior to finalizing the alignments.<br />

129. 7.1 1123 One parcel along the 407 employment lands<br />

located west <strong>of</strong> Brock Road immediately south <strong>of</strong><br />

the 407 has no road and appears to be<br />

landlocked.<br />

130. 7.1 1123 A comprehensive restoration plan should be<br />

developed for Seaton to address the impacts due<br />

to local road (and infrastructure) crossings. The<br />

impacts should be estimated at the MESP stage<br />

and clarified in detail at the NFSSR stage. The<br />

general location and area <strong>of</strong> restoration within the<br />

Seaton NHS should be identified. In some cases,<br />

restoration can take place on site. In others, this<br />

may not be possible and a restoration bank<br />

should be developed.<br />

131. 7.1.1 1123 Open bottom crossings should be provided for all<br />

crossings. If open bottom crossings are not<br />

appropriate for certain locations, then perhaps<br />

alternative locations should be evaluated.<br />

132. 7.1.1 1124 Please note that the 5 times bank full width<br />

approach to sizing water crossings is a planning<br />

tool only and only applies to a stable system. The<br />

5 times bank full may not be applicable for the<br />

sensitive reaches in Seaton.<br />

133. 7.1.1 1124 The minimum structural requirement from a fluvial<br />

perspective is to ensure the abutments <strong>of</strong> any<br />

watercourse crossing are located outside the 100<br />

year erosion limit.<br />

For information only. To be addressed at NFSSR<br />

stage. Site visit days should be set up well in<br />

advance.<br />

Provide information on how this parcel will be<br />

accessed.<br />

The Province as the owner <strong>of</strong> the NHS needs to be<br />

involved in this discussion. Prepare a restoration<br />

plan. Refine the plan at the NFSSR stage.<br />

Add a recommendation that open bottom culverts<br />

should be used for all crossings.<br />

Test the 5 times bank full generalization on a<br />

sensitive reach within Seaton to determine if it is<br />

appropriate to use everywhere. Perhaps it may be<br />

worthwhile to remove the 5 times bankfill criteria<br />

and focus on ensuring the appropriate criterion is in<br />

place for the NFSSRs. Detailed fluvial<br />

assessments will be required for all crossings at the<br />

NFSSR stage.<br />

Please ensure the minimum structural requirements<br />

are included in the criteria.<br />

Consulting Team’s Response<br />

April 27, 2011<br />

-requires further discussion<br />

Acknowledged.<br />

As shown in the Neighbourhood Plan, the parcel<br />

will be accessed by a local road from the east,<br />

connecting to Old Brock Road.<br />

A comprehensive restoration plan will not be<br />

prepared. No compensation is proposed for<br />

non-Regional roads through the NHS that were<br />

in the CPDP.<br />

The requirement for open bottom crossings is<br />

currently noted is Sections C7.1.1 and C7.1.2.<br />

The 5 times bankfull criteria will be removed and<br />

the focus will be on ensuring the appropriate<br />

criterion is in place for the NFSSR.<br />

The minimum structural requirements were<br />

mentioned in the text but not explicitly as criteria.<br />

This will be added to the criteria.<br />

Action Taken<br />

MESPA December 2011<br />

Site walks will be coordinated with TRCA through<br />

the NFSSRs.<br />

No action required.<br />

The Roads Checklist indicates where<br />

compensation will be required for non-Regional<br />

roads.<br />

This requirement is provided in the Road Checklist<br />

table, detailed in <strong>Chapter</strong> C, and will be completed<br />

at the NFSSR stage.<br />

The requirement to determine this is detailed in the<br />

Roads Checklist (see Section C6.4.2 and Table<br />

C6.13).<br />

The MESPA is revised to include the Roads<br />

Checklist (see Section C6.4.2 and Table C6.13).<br />

Noted.<br />

TRCA Comment on MESPA<br />

An access is now shown in the land use layer on<br />

the pmf. Details for this crossing, as with the<br />

other crossings, will be required at the NFSSR<br />

stage.<br />

We need to meet with MNR to discuss<br />

comprehensive restoration plan.<br />

Noted.<br />

Addressed.<br />

Addressed.<br />

Team Response<br />

February 2013<br />

Comments acknowledged. To be<br />

addressed in NFSSR for Neighbourhood<br />

20.<br />

Comment acknowledged.<br />

134. 7.1.1 1124 A crossing criteria needs to be developed for<br />

intermittent channels/swales where the flow<br />

regime may change under post development<br />

conditions. For example, it is likely that existing<br />

intermittent watercourses may flow permanently<br />

under post development conditions due to<br />

extended inputs from SWMFs.<br />

135. Table C7.1 1125 Figure C3.1 refers to 37 crossings, yet Table C7.1<br />

refers to only 31.<br />

136. 7.1.2 1127 Ecopassages are required for all NHS crossings,<br />

not only at the locations where a watercourse<br />

exists. No information has been provided for the<br />

location and number <strong>of</strong> ecopassages. Evaluation<br />

is required as part <strong>of</strong> the Terms <strong>of</strong> Reference.<br />

137. 7.1.2 1127 The crossing criteria for roads need to be outlined<br />

at the MESP stage. The design parameters for<br />

each structure should be laid out, i.e. what are the<br />

factors driving the sizes <strong>of</strong> the structures? This<br />

includes ecopassages where no watercourse<br />

exists. Criteria that would apply in the fullness <strong>of</strong><br />

time as the NHS renaturalizes need to be<br />

Please develop crossing criteria for such cases.<br />

The required criteria will be indicated in the<br />

Roads Checklist, <strong>Chapter</strong> C.<br />

The MESPA is revised to include the Roads<br />

Checklist (see Section C6.4.2 and Table C6.13).<br />

Further, it is clarified that any channel that has<br />

been identified, regardless <strong>of</strong> its flow regime, will be<br />

addressed.<br />

Please document crossings 16-21. Table C7.1 was removed as suggested. The Table is removed from MESPA. Noted.<br />

Identify generally where and how many<br />

ecopassages are needed, and a framework for how<br />

large they should be. Provide this information on a<br />

map. Details <strong>of</strong> the ecopassages can be provided<br />

at the NFSSR stage.<br />

Provide the criteria that need to be considered for<br />

each crossing, including wildlife passage,<br />

vegetation communities, aquatic, geomorphic,<br />

hydraulics, trails, etc. Details <strong>of</strong> the crossing<br />

design can be provided at the NFSSR stage.<br />

Acknowledged.<br />

Acknowledged.<br />

A new figure, Figure C6.2, is provided showing all<br />

NHS crossings. Direction for design <strong>of</strong> all<br />

crossings with regard to wildlife passage is<br />

provided in the Road Checklist. See Section<br />

C6.4.2, Table C6.13. Details <strong>of</strong> crossing designs<br />

including wildlife passage will be provided in the<br />

NFSSRs.<br />

There is a Road Checklist for each non-Regional<br />

Road NHS crossing which identifies criteria and<br />

assessment requirements for design in the<br />

NFSSRs.<br />

We could not locate the text in this section that<br />

speaks to addressing this issue. Please provide<br />

additional detail, and clarify what is meant by<br />

“formalizing the channel” in regards to channels<br />

where is it not possible to avoid fine sediment<br />

banks and vegetation control (under Fluvial<br />

Geomorphology criteria in Table C6.13).<br />

Noted.<br />

Noted, however see response to Comment<br />

#134.<br />

Table C6.13 has been edited to include:<br />

references to intermittent channels swales;<br />

and, clarification with regard to ‘formalizing<br />

the channel’.<br />

PAGE 32 February 2013