Comments in white are satisfied.<br />

Comments in orange background are not satisfied or are new comments.<br />

Comments in blue background can be addressed at the NFSSR stage.<br />

Comments in yellow are deferred due to need for hydrology model.<br />

APPENDIX A. TRCA COMMENTS ON SEATON MESPA DECEMBER 2011; MESPA TEAM RESPONSE FEBRUARY 2013<br />

# Section #<br />

Page # in<br />

PDF TRCA Comment Action Required<br />

Consulting Team’s Response<br />

April 27, 2011<br />

Action Taken<br />

MESPA December 2011<br />

be part <strong>of</strong> the MESP or the EA? TRCA supports<br />

the removal <strong>of</strong> this road from the road network as<br />

it will, cumulatively, increase the impacts to West<br />

Duffins creek in association with the other two<br />

proposed crossings.<br />

145. 1138 Figure C1.7 will need to be revised given the Revise figure as suggested. New Brock Road interchange now finalized. The Figure is revised to show the new Brock road<br />

Huron-Wendat village location.<br />

interchange.<br />

146. Figure C3.1 1141 There are two missing watercourse crossings. No action required in the MESP, but the EA will Acknowledged.<br />

No action required as this is part <strong>of</strong> the Regional<br />

These are on the Whitevale bypass on small need to include these crossings.<br />

EA work.<br />

headwater drainage features, one each west <strong>of</strong><br />

crossings G and I.<br />

Noted.<br />

Noted.<br />

TRCA Comment on MESPA<br />

Team Response<br />

February 2013<br />

147. Table 1 1177 We note that none <strong>of</strong> the West Duffins crossings<br />

are identified in Table 1 or on associated maps.<br />

For information. We will ensure that these<br />

crossings are addressed through the EA. No<br />

response required.<br />

Acknowledged.<br />

No action required as this is part <strong>of</strong> the Regional<br />

EA work.<br />

Noted.<br />

Appendix C3-B - Crossing Constraints NOTE: THIS IS APPENDIX C6-A<br />

148. Crossing #3 1181 The location <strong>of</strong> seeps observed in field should be<br />

mapped. Shift alignment to the north to avoid<br />

swales and trees and to cross at a narrower<br />

location.<br />

149. Crossing #4 1181 Cross further to the north to avoid the diagonal as<br />

suggested.<br />

150. Crossing #7 1181 Barrier should be removed as part <strong>of</strong> road<br />

improvements. Butternut identified to south.<br />

Revise accordingly.<br />

Revise accordingly.<br />

Revise accordingly.<br />

No specific seeps were identified during either<br />

the geomorphological site walks or the crossing<br />

investigations. The area where watercress was<br />

noted is indicated by the ground photo arrow on<br />

the Crossing figure in the Phase 1 Background<br />

report.<br />

The crossing was diagonal but was realigned as<br />

per recommendations prior to MESP issuance.<br />

In Table 1, Appendix C3-B, it is noted that the<br />

culvert is a barrier to fish movement. An explicit<br />

comment can be added in the ‘Implications’<br />

column stating that whenever the road is<br />

upgraded, that the barrier should be removed.<br />

No action required.<br />

The location <strong>of</strong> the road is based on detailed work<br />

related to the Neighbourhood Plans. Final design<br />

will be done at the NFSSR stage.<br />

Table 1 in Appendix C6-A is revised.<br />

Table 1 in Appendix C6-A is revised.<br />

The roads checklist shows the road crossing a<br />

fairly wide part <strong>of</strong> the NHS in the wetland. Our<br />

comment to try and move it northward to a<br />

narrower spot still seems relevant. We expect<br />

that the placement <strong>of</strong> the road bed within the<br />

wetland area could be detrimental yet this is not<br />

discussed in the checklist.<br />

There appears to have been a slight skew <strong>of</strong> this<br />

road on the pmf, however nothing has been<br />

revised in the table indicated with regard to<br />

Crossing #4.<br />

This crossing location should be removed as<br />

there is nothing proposed here.<br />

A comment re the presence <strong>of</strong> a butternut, ~60-<br />

70m south <strong>of</strong> the road, will be added to the table.<br />

151. Crossing #8 1182 There is no ELC for north side. Clarify data gap. Figure will be revised. The Figure for Crossing #8 is revised. This crossing location should be removed as<br />

there is nothing proposed here.<br />

152. Crossing #9 1182 Bobolinks noted at this location. What is “edge<br />

preparation”?<br />

153. Crossing<br />

#10<br />

154. Crossing<br />

#11<br />

1182 Widen to west to avoid marsh. What is the eastwest<br />

road that is being referenced here?<br />

1182 How will road drainage be treated next to the<br />

wetland?<br />

Clarify. Edge preparation will be clarified. The Roads Checklist (see Section C6.4.2 and<br />

Table C6.13) details edge management<br />

requirements.<br />

Revise and clarify accordingly.<br />

Clarify.<br />

Table 1 <strong>of</strong> Appendix C3-B identifies that<br />

Crossing 10 is at North Road, (an existing road).<br />

The reference to an east-west road is to an<br />

additional local road that may be required and<br />

will be investigated at the NFSSR stage.<br />

The requirement to address road drainage will<br />

be included in the Roads Checklist.<br />

Noted.<br />

A reference to this wetland and the issues<br />

it may present now is included in the<br />

Checklist.<br />

The final crossing will be determined<br />

through the NFSSR, and any ‘skew’ that<br />

may show in the pmf is conceptual, and as<br />

such no reference should or is made in the<br />

table.<br />

There is an existing crossing in this<br />

location that was required to be examined.<br />

Although nothing is proposed at this time,<br />

the information in the MESPA remains<br />

valid if road improvements are proposed in<br />

the future.<br />

There is an existing crossing in this<br />

location that was required to be examined.<br />

Although nothing is proposed at this time,<br />

the information in the MESPA remains<br />

valid if road improvements are proposed in<br />

the future.<br />

The MESPA text is clarified. No mention <strong>of</strong> avoiding marsh. The east-west road is discussed as<br />

Crossing #25.<br />

The Roads Checklist is included in the MESPA<br />

(see Section C6.4.2 and Table C6.13) and the<br />

details will be provided in the NFSSRs (see<br />

Appendix C6-C).<br />

The road checklist speaks to the removal <strong>of</strong> a<br />

dam and existing farm crossing upstream but<br />

only speaks to restoration for the crossing itself.<br />

Restoration will be needed in the removal areas<br />

too. To be implemented at NFSSR stage.<br />

PAGE 34 February 2013