ANNUAL REPORT <strong>2010</strong>-<strong>11</strong> ________________________________________________________<br />
present, all efforts have been made in your<br />
Company for using energy more efficiently and<br />
judiciously.<br />
Conservation is only possible by creating<br />
awareness at all levels and adopting conservation<br />
measures. Thus for creating awareness, energy<br />
conservation meetings were organized amongst<br />
the employees during the year <strong>2010</strong>-<strong>11</strong>.<br />
All efforts have been made to improve<br />
specific consumption of Power, HSD & Lubricant<br />
which are the basic input for production purpose.<br />
There has been improvement in specific<br />
consumption of Power during the year <strong>2010</strong>-<strong>11</strong>.<br />
However, there is a marginal increase in specific<br />
consumption of HSD & Lubricant, though absolute<br />
consumption is less. The main reason is increase<br />
in haul road length as well as depth of the mines.<br />
The following table depicts the Specific Energy<br />
Consumption values for the year <strong>2010</strong>-<strong>11</strong>, with<br />
respect to the year 2009-10:<br />
Specific Consumption* <strong>2010</strong>-20<strong>11</strong> 2009-<strong>2010</strong><br />
POWER kWh/CuM 5.645 6.129<br />
HSD Ltrs./CuM 0.935 0.910<br />
Lubricant Ltrs./CuM 0.043 0.035<br />
* The computation of specific power consumption also includes the<br />
power consumed in service units of the Areas and composite product<br />
of UGs & OCPs. The computation of specific consumption of POL<br />
is only for opencast projects of the Company.<br />
Tentative benchmarking for HSD of 14 Open<br />
Cast Mines of <strong>CCL</strong> have been carried out by<br />
CMPDIL. Detailed reports on HSD consumption<br />
audit and bench-marking of Jharkhand, Kathara,<br />
Ashoka & Birsa opencast mines have also been<br />
carried out by CMPDIL. Specific consumption of<br />
HSD for all the 14 Opencast mines is being<br />
monitored every month and performance is being<br />
placed in CMDs meet for review.<br />
13. COMMUNICATION ARRANGEMENT<br />
AND INFORMATION SYSTEM<br />
A. Underground Communication :<br />
Installation and commissioning of seven<br />
U.G. telecom systems( Auto cum Manual<br />
Communication Systems) were completed<br />
successfully at Kuju, Pindra, Topa,<br />
Sarubera(Kuju Area), Jarangdih( Kathara<br />
Area), Khasmahal Ph-II( B&K Area ), Dhori<br />
16<br />
Khas(Dhori Area). These systems are<br />
working perfectly.<br />
B. Revival & Repair of PLC System at<br />
Piparwar Project :<br />
The repair and revival of three PLC Sub<br />
Stations that are vital in production /<br />
productivity of prestigious Piparwar Project<br />
were planned and a work order has been<br />
placed on the authorized system integrator<br />
of OEM for execution of the job in the first/<br />
second quarter of 20<strong>11</strong>-12. The repair and<br />
revival shall ensure trouble free working of<br />
CHP/CPP of Piparwar.<br />
C. Environmental Tele Monitoring System:<br />
A System for online monitoring of<br />
environmental parameters for Swang UG<br />
Mine is being implemented for the first time<br />
in <strong>CCL</strong>. Tendering for the System is being<br />
dealt by CMC Deptt. of your Company. The<br />
System monitors critical parameters of the<br />
Mine like CH 4<br />
, CO, Temperature/ Humidity<br />
etc.<br />
D. Mobile Closed User Group Network :<br />
Close user group network of mobile phones<br />
along with FCT’s and PRI connectivity for<br />
<strong>CCL</strong> EPABX is under process of<br />
procurement. This System shall provide<br />
faster and seamless communication<br />
between <strong>CCL</strong> Head Quarter and Areas/<br />
Units of <strong>CCL</strong>.<br />
E. E. WAN/ LAN Networks :<br />
System design and implementation of Wide<br />
Area Network (WAN) in <strong>CCL</strong> connecting all<br />
Area Offices, Regional Stores, Rail & Road<br />
Weigh Bridges, Central Hospitals, Mines<br />
Rescue Station (MRS) has been planned<br />
by E&T Deptt. of your Company. The<br />
System, to be implemented in 20<strong>11</strong>-12 shall<br />
bring faster information exchange between<br />
<strong>CCL</strong> HQ and Areas/ Units.<br />
F. R&D Projects :<br />
1. Indigenously developed Intrinsically safe<br />
PLC based Integrated Control and<br />
monitoring System for Conveyors and other<br />
equipment of UG Mines has been