ANNUAL REPORT <strong>2010</strong>-<strong>11</strong> ________________________________________________________<br />

present, all efforts have been made in your<br />

Company for using energy more efficiently and<br />

judiciously.<br />

Conservation is only possible by creating<br />

awareness at all levels and adopting conservation<br />

measures. Thus for creating awareness, energy<br />

conservation meetings were organized amongst<br />

the employees during the year <strong>2010</strong>-<strong>11</strong>.<br />

All efforts have been made to improve<br />

specific consumption of Power, HSD & Lubricant<br />

which are the basic input for production purpose.<br />

There has been improvement in specific<br />

consumption of Power during the year <strong>2010</strong>-<strong>11</strong>.<br />

However, there is a marginal increase in specific<br />

consumption of HSD & Lubricant, though absolute<br />

consumption is less. The main reason is increase<br />

in haul road length as well as depth of the mines.<br />

The following table depicts the Specific Energy<br />

Consumption values for the year <strong>2010</strong>-<strong>11</strong>, with<br />

respect to the year 2009-10:<br />

Specific Consumption* <strong>2010</strong>-20<strong>11</strong> 2009-<strong>2010</strong><br />

POWER kWh/CuM 5.645 6.129<br />

HSD Ltrs./CuM 0.935 0.910<br />

Lubricant Ltrs./CuM 0.043 0.035<br />

* The computation of specific power consumption also includes the<br />

power consumed in service units of the Areas and composite product<br />

of UGs & OCPs. The computation of specific consumption of POL<br />

is only for opencast projects of the Company.<br />

Tentative benchmarking for HSD of 14 Open<br />

Cast Mines of <strong>CCL</strong> have been carried out by<br />

CMPDIL. Detailed reports on HSD consumption<br />

audit and bench-marking of Jharkhand, Kathara,<br />

Ashoka & Birsa opencast mines have also been<br />

carried out by CMPDIL. Specific consumption of<br />

HSD for all the 14 Opencast mines is being<br />

monitored every month and performance is being<br />

placed in CMDs meet for review.<br />

13. COMMUNICATION ARRANGEMENT<br />

AND INFORMATION SYSTEM<br />

A. Underground Communication :<br />

Installation and commissioning of seven<br />

U.G. telecom systems( Auto cum Manual<br />

Communication Systems) were completed<br />

successfully at Kuju, Pindra, Topa,<br />

Sarubera(Kuju Area), Jarangdih( Kathara<br />

Area), Khasmahal Ph-II( B&K Area ), Dhori<br />

16<br />

Khas(Dhori Area). These systems are<br />

working perfectly.<br />

B. Revival & Repair of PLC System at<br />

Piparwar Project :<br />

The repair and revival of three PLC Sub<br />

Stations that are vital in production /<br />

productivity of prestigious Piparwar Project<br />

were planned and a work order has been<br />

placed on the authorized system integrator<br />

of OEM for execution of the job in the first/<br />

second quarter of 20<strong>11</strong>-12. The repair and<br />

revival shall ensure trouble free working of<br />

CHP/CPP of Piparwar.<br />

C. Environmental Tele Monitoring System:<br />

A System for online monitoring of<br />

environmental parameters for Swang UG<br />

Mine is being implemented for the first time<br />

in <strong>CCL</strong>. Tendering for the System is being<br />

dealt by CMC Deptt. of your Company. The<br />

System monitors critical parameters of the<br />

Mine like CH 4<br />

, CO, Temperature/ Humidity<br />

etc.<br />

D. Mobile Closed User Group Network :<br />

Close user group network of mobile phones<br />

along with FCT’s and PRI connectivity for<br />

<strong>CCL</strong> EPABX is under process of<br />

procurement. This System shall provide<br />

faster and seamless communication<br />

between <strong>CCL</strong> Head Quarter and Areas/<br />

Units of <strong>CCL</strong>.<br />

E. E. WAN/ LAN Networks :<br />

System design and implementation of Wide<br />

Area Network (WAN) in <strong>CCL</strong> connecting all<br />

Area Offices, Regional Stores, Rail & Road<br />

Weigh Bridges, Central Hospitals, Mines<br />

Rescue Station (MRS) has been planned<br />

by E&T Deptt. of your Company. The<br />

System, to be implemented in 20<strong>11</strong>-12 shall<br />

bring faster information exchange between<br />

<strong>CCL</strong> HQ and Areas/ Units.<br />

F. R&D Projects :<br />

1. Indigenously developed Intrinsically safe<br />

PLC based Integrated Control and<br />

monitoring System for Conveyors and other<br />

equipment of UG Mines has been