ANNUAL REPORT <strong>2010</strong>-<strong>11</strong> ________________________________________________________<br />
(d)<br />
the differences in the issue of<br />
diesel as per flow meter and dip<br />
reading on daily basis and did<br />
not report the same to<br />
competent authority.<br />
Dip readings were not being<br />
properly maintained at Diesel<br />
Dispensing Unit (DDU) and the<br />
person authorized to sign<br />
documents related with the<br />
affairs of Diesel Dispensing Unit<br />
(DDU) went on refusing to sign<br />
the same in disregard to<br />
the repeated administrative<br />
instructions of the competent<br />
officials.<br />
D(T/O) was advised to take<br />
appropriate action as deemed fit in<br />
the matter.<br />
20. While investigating a case of RCC<br />
pavement of a road in one of the<br />
Areas following System improvement<br />
suggestions were made:<br />
i. Price of bidder should be sealed<br />
in a single envelope for getting<br />
signature of all the bidders and<br />
TC members and file is to be<br />
kept in safe custody till its<br />
opening.<br />
ii.<br />
Action is required to be taken<br />
for improving quality<br />
awareness/ establishing quality<br />
control infrastructure at Head<br />
Quarter level in the interest of<br />
quality assurance in Civil<br />
Engineering works.<br />
iii. TC should deliberate the<br />
reasonability of rates with<br />
specific mention of analyzed<br />
rate / last awarded rates etc. in<br />
clear terms, justifying their<br />
reasonability.<br />
21. In course of a vigilance investigation<br />
in case of “Procurement of AAA<br />
Conductor,” it has been suggested<br />
that before placing the final order for<br />
40<br />
procurement of a Capital item the<br />
current site condition / ground realities<br />
needs to be updated so that procured<br />
material doesn’t remain idle for a long<br />
time.<br />
22. In course of a vigilance investigation<br />
in case of “Road Sale in <strong>CCL</strong>,”<br />
modification to the present guidelines<br />
applicable for road sale has been<br />
suggested to stop the unfair practices<br />
in Road Sales Centers during dying<br />
hours of validity.<br />
23. In course of a vigilance investigation<br />
in case of “Lifting cum balance<br />
Certificate for Road Sale at Rohini<br />
Project”, following system<br />
improvement have been suggested :<br />
i. Suitable guidelines regarding<br />
proper official procedure to be<br />
followed in maintenance of note<br />
sheets (in this case<br />
replacement of notesheets was<br />
found).<br />
ii. Suitable remedial action/<br />
issuance of guideline for<br />
preparation of realistic road sale<br />
offer, commensurate with the<br />
available stock.<br />
4. Observance of Vigilance Awareness<br />
Week : In line with the Central Vigilance<br />
Commission's directive, the Vigilance<br />
Awareness Period was observed with much<br />
fervor and enthusiasm in all units, Areas and<br />
Headquarters from 25.10.<strong>2010</strong> to<br />
1.<strong>11</strong>.<strong>2010</strong>. The week started with taking of<br />
pledge by all the employees. The pledge<br />
ceremony at HQ was also attended by the<br />
CMD, CVO, D(T)Oprn. and D(F), <strong>CCL</strong>. The<br />
observance of Vigilance Awareness Week<br />
in the Areas commenced with the PLEDGE<br />
taken by the employees on 25th October<br />
<strong>2010</strong> at <strong>11</strong>.00 AM. The PLEDGE was<br />
administered by the highest functionary<br />
present i.e Chief General Manager/ General<br />
Manager.<br />
i. Banners and posters containing<br />
thought-provoking slogans were<br />
displayed in all the units/ offices.