ANNUAL REPORT <strong>2010</strong>-<strong>11</strong> ________________________________________________________<br />
30. GEOLOGICAL SERVICES<br />
A. Drilling:<br />
Against the target of 1.0 lakh meters, total<br />
1.05 lakh meters of drilling has been done<br />
during the financial year <strong>2010</strong>-<strong>11</strong>, achieving<br />
a productivity level of more than 1250<br />
meters per drill per month with 7 operating<br />
drills from 2 base drilling camps Topa and<br />
Lapanga. This includes the drilling of blast<br />
holes for mining services, large diameter<br />
boreholes for dewatering & tube wells for<br />
potable water and non-coring boreholes for<br />
exploration purposes.<br />
B. Project Documentations and Related<br />
works<br />
6. In association with CMPDI finalization<br />
of blocks of <strong>CCL</strong> command area for<br />
upcoming projects related to new<br />
technologies UCG (Underground<br />
Coal Gasification) and CMM (Coal<br />
Mine Methane).<br />
7. Preparation of plans by integration of<br />
toposheet maps for projects to mark<br />
the buffer zones for environment<br />
division.<br />
8. Technical evaluation of the proposals<br />
for outsourcing of patches e.g. Amlo,<br />
Topa OCP,Parej East Extension,<br />
Pindra, Pipradih etc. in <strong>CCL</strong><br />
Command Area for different activities<br />
of production.<br />
(I)<br />
On Geology: During the year <strong>2010</strong>-<strong>11</strong> the<br />
following activities have been completed.<br />
Majority of them being related to production<br />
support mining services and for future<br />
mining activities :<br />
9. Geological study of areas in <strong>CCL</strong><br />
command area for demarcation of<br />
non coal bearing areas for finalization<br />
of location for Civil Structures, railway<br />
siding etc.<br />
1. Study on possibility of integration of<br />
projects including blocks of<br />
Jharkhand, Laiyo, Kedla, Gose,<br />
Gose-east of WBCF.<br />
2. Study of alternative site location for<br />
proposed STPP of NTPC in NKCF in<br />
association with CMPDI.<br />
3. Preparation of land cover/land use<br />
plans of different areas showing forest<br />
cover for site selection of new<br />
washeries.<br />
4. Preparation of plans for support to<br />
different activities related to L&R,<br />
Civil, Environment, Washery and<br />
Areas to meet the requirement of<br />
solution to various issues.<br />
5. Updation of coal resource data in <strong>CCL</strong><br />
command Area, Mineable coal<br />
reserves of existing operating mines<br />
as on 01-04-<strong>2010</strong>, based on data<br />
provided by CMPDI in association<br />
with MECL and GSI.<br />
(ii)<br />
10. Geological study for reserve<br />
assessment of potentiality for out<br />
sourcing patch in Chalkari of EBCF.<br />
<strong>11</strong>. Study of Geological plans of GSI and<br />
MECL for finalization of block<br />
boundary of Burhakhap block of<br />
Ramgarh coalfield.<br />
12. Organised training program on Minex<br />
software for Geology and Mining<br />
modules of the software.<br />
13. Evaluation of tender for pilot project<br />
on underground coal gassification in<br />
Kaitha block, Ramgarh Coalfield.<br />
14. Association with finalization of<br />
conveyance deed for captive bocks<br />
Ganeshpur and Seregarha.<br />
15. Study and providing solutions to<br />
issues of bock boundaries of blocks<br />
allocated to different parties.<br />
On Washery: Association with the work<br />
related to finalization of the location of<br />
34