06.11.2014 Views

Waterway Panorama - Antaq

Waterway Panorama - Antaq

Waterway Panorama - Antaq

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

l <strong>Waterway</strong> <strong>Panorama</strong><br />

Of the 211 authorized maritime and support<br />

navigation companies, 168 inspections were<br />

scheduled to the PAF/2009 up to November<br />

2008, comprising 80% of the total number of<br />

companies. Until August 2009, inspections were<br />

planned at 108 companies authorized to operate<br />

in long-haul shipping, cabotage, maritime support,<br />

and port support. Of this total, 104 inspections<br />

were effectively carried out inspections (96%<br />

of the schedule for the period ranging from January<br />

to August and 62% for year 2009), with the<br />

following results:<br />

STATUS OF INSPECTIONS CARRIED OUT<br />

PAF/2009 (until August)<br />

Regular before ANTAQ<br />

Regular upon fulfillment of the Term of Settlement (TAC)<br />

TAC proposed<br />

Fulfilling TAC<br />

Under Simplified Administrative Proceeding (PAS)<br />

Under analysis of suggestions for the establishment of the Litigious Administrative Proceeding (PAC)<br />

Within the deadline to remedy inspection holdovers<br />

Preparing the Inspection Report<br />

Grant waiver<br />

Proceedings suspended according to Administrative Rule 227/2008-DG, relating to the evidence of<br />

maritime support navigation operation<br />

Amount<br />

55<br />

4<br />

3<br />

7<br />

1<br />

5<br />

2<br />

13<br />

4<br />

10<br />

Among the requirements of ANTAQ for companies<br />

to keep grants, deficiencies often detected<br />

are: lack of documents (audited balances<br />

sheets, financial statements, certificates, and<br />

documents of the vessel), proof of current ratio<br />

and proof of operation.<br />

As for Extraordinary Inspections, 29 companies<br />

were inspected until August 2009, the equivalent<br />

of 30 inspections, considering the type of<br />

navigation, for investigations on alleged illegal<br />

operations and compliance with Resolution<br />

843/ANTAQ by Dredging companies, with the<br />

following results:<br />

STATUS OF INSPECTIONS CARRIED OUT<br />

EXTRAORDINARY INSPECTIONS 2009 (until August)<br />

PAC brought for operations without the authorization of ANTAQ<br />

Irregularity not proven<br />

Dredging companies requesting complaints<br />

Dredging companies that are regular before ANTAQ<br />

Preparing the Inspection Report<br />

Amount<br />

2<br />

5<br />

8<br />

11<br />

3<br />

76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!