Contents<br />
OUR ORGANISATION<br />
Building and maintenance provisions of the Building Act 1993<br />
Pursuant to section 220 of the Building Act 1993, the <strong>Royal</strong> <strong>Botanic</strong> <strong>Gardens</strong> Board<br />
Victoria ensures that all works requiring building approval have plans certified, works<br />
in progress inspected and Occupancy Permits issued by independent Building<br />
Surveyors engaged on a local job-by-job basis. It also ensures that plans for these<br />
works are lodged with the relevant local council.<br />
The <strong>Royal</strong> <strong>Botanic</strong> <strong>Gardens</strong> Board Victoria requires all building practitioners engaged<br />
on building works to be registered and to maintain registration throughout the course<br />
of the work.<br />
Buildings are maintained in a safe and serviceable condition through routine and<br />
responsive maintenance.<br />
Building work<br />
At RBG Cranbourne, there were no new buildings constructed during <strong>2010</strong>–11;<br />
however minor upgrade works in the Nursery were undertaken to create a new<br />
propagation area and additional office space.<br />
The design of two shelters and three buildings in the Australian Garden Stage 2 was<br />
undertaken by Registered Building Practitioners and reviewed by an independent<br />
Building Surveyor.<br />
Maintenance<br />
At RBG Cranbourne, major works were undertaken on the security system including<br />
mapping and zoning of the system, upgrading of movement sensors and the<br />
introduction of an annual compliance audit to ensure all movement sensors, Passive<br />
Infra-red Sensors (PIRs) and smoke alarms are operational.<br />
<strong>Annual</strong> maintenance and improvement works were undertaken including painting,<br />
replacement of faulty fittings, and replacement and repairs to the control panels<br />
of the lift, the pump house irrigation system and the automatic entry doors to the<br />
Boonerwurrung Café, after a power brown-out had caused them to fail.<br />
Three replacement drivers were installed into the Rockpool Waterway pump house<br />
and major servicing of two of the four sewer pumps on site was undertaken.<br />
Programmed maintenance and regular servicing of HVAC systems, exit and<br />
emergency lighting, portable fire equipment, automatic doors and moveable walls<br />
and the visitor centre lift was carried out to ensure that they were kept in a safe<br />
and serviceable condition. An annual program of thermographic scanning of all<br />
switchboards and distribution boards was introduced and there was regular<br />
servicing and maintenance of the three septic tank systems on site.<br />
An annual Essential Safety Measure Compliance Audit was undertaken, which<br />
included quarterly access and egress inspections.<br />
At RBG Melbourne, the recovery work on buildings affected by the severe hail storm on<br />
6 March <strong>2010</strong> was completed and the affected buildings brought back up to standard.<br />
In addition, a five-year plan commenced to rectify building defects identified in a<br />
comprehensive defects report prepared in 2009–10 for all RBG Melbourne buildings.<br />
The defects were prioritised from one through to five, with one being the most urgent.<br />
To date, 85 per cent of Priority One and Two items has been rectified.<br />
page 22