06.11.2012 Views

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FLUE OUTLET<br />

20<br />

17 FLUE EXTENSION DUCTS - continued<br />

1. A maximum of 6 extension ducts for the HE24/<br />

HE30 and a maximum of 3 extension ducts for<br />

the HE35 (one suitably cut) plus the standard<br />

flue duct may be used together.<br />

2. Flue extensions of greater length than 1m (39")<br />

should be supported with the bracket provided,<br />

suitably adjusted. Refer to Frames 16 and 24.<br />

3. Only use water as a lubricant during assembly.<br />

Do not use mineral based oils.<br />

18 FITTING THE KIT<br />

INSTALLATION<br />

16 FLUE EXTENSION DUCTS - For total flue lengths greater than 595mm<br />

Pack D Flue extension duct kit contents<br />

Extension duct & clamp<br />

1.0m (39") long<br />

nm8732<br />

General arrangement<br />

Flue duct support<br />

Use a maximum of 6m extended flue ONLY (HE24 & 30)<br />

Use a maximum of 3m extended flue ONLY (HE35)<br />

Because of the flexibility of the telescopic flue terminal it is not<br />

always necessary to cut an extension pack.<br />

1. Measure the total flue length from the centre of the boiler<br />

outlet to the outside wall.<br />

2. Subtract 70mm from this dimension.<br />

3. Subtract 950mm for each ‘D’ pack to be used.<br />

4. If the remainder Y is 300mm -<br />

525mm this can be taken up 70<br />

by the adjustment in the<br />

telescopic flue.<br />

5. If the remainder Y is 525mm -<br />

950mm it will be necessary to<br />

cut a ‘D’ pack to 400mm.<br />

esp8940<br />

950<br />

Flue support cutting aid<br />

(shown folded up)<br />

Wall plugs - 4 off<br />

No. 10 x2" wood screw - 4 off<br />

Boiler<br />

nm8762<br />

Flue length<br />

Extension flue<br />

Standard flue<br />

Terminal grille<br />

Note. Side flue shown<br />

6. If the remainder Y is less than 300mm, shorten the<br />

previous ‘D’ pack to 400mm and adjust the telescopic<br />

terminal.<br />

7. Measure and mark the length on the flue, to ensure a<br />

square cut mark the flue all the way around and cut to<br />

length.<br />

L<br />

Y<br />

525<br />

300<br />

Esprit - Installation and Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!