06.11.2012 Views

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION<br />

22<br />

21 CONDENSATE DRAIN<br />

Refer also to the British Gas document: 'Guidance Notes<br />

for the Installation of Domestic Gas Condensing Boilers'<br />

(1989).<br />

Ensure that the siphon is full of water before<br />

commissioning the boiler . Refer to Frame 24.<br />

The routing of the drain must be made to allow a<br />

minimum fall of 1 in 20 away from the boiler, throughout<br />

its length.<br />

The drainage pipework must be arranged so that<br />

obstruction (e.g. through freezing) of external drainage<br />

pipe does not give rise to spillage within the dwelling.<br />

IMPORTANT.<br />

All pipework and fittings in the condensate drain system<br />

must be made of plastic. No other materials may be<br />

used. The maximum length of external plastic pipework<br />

is 3m and must be insulated.<br />

The drain outlet on the boiler is standard 21.5mm<br />

overflow pipe and is suitable for either push fit or solvent<br />

weld applications. This size must not be reduced in any<br />

part of its length.<br />

The boiler includes as standard, a 75mm condensate<br />

trap. The condensate trap also includes a siphon to<br />

reduce the possibility of freezing in the drain outlet.<br />

BOILER<br />

esp8880<br />

INSTALLATION<br />

22 CONDENSATE PIPE TERMINATION CONFIGURATIONS<br />

Note. ALL EXTERNAL PIPE RUNS MUST BE INSULATED<br />

MAXIMUM EXTERNAL PIPE LENGTH IS 3 METRES<br />

1. INTERNAL TO SINK WASTE<br />

UPSTREAM OF SINK WASTE<br />

TRAP<br />

2. INTERNAL TO SINK WASTE<br />

DOWNSTREAM OF SINK<br />

WASTE TRAP (PREFERRED<br />

METHOD)<br />

BOILER<br />

esp8881<br />

53<br />

Sink constitutes<br />

air break<br />

Sink<br />

49<br />

Condensate<br />

Drain<br />

DRAIN<br />

DRAIN<br />

129<br />

Open end of pipe<br />

direct into gulley<br />

below grating but<br />

above water level<br />

Ground Level<br />

Open end of pipe<br />

direct into gulley<br />

below grating but<br />

above water level<br />

Ground Level<br />

continued . . . .<br />

Esprit - Installation and Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!