06.11.2012 Views

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SERVICING<br />

48<br />

SERVICING<br />

64 CONDENSATE TRAP/SIPHON REPLACEMENT<br />

1. Refer to Frame 52.<br />

2. Swing the control box down into the servicing position.<br />

Refer to Frame 46.<br />

3. Pull off the rubber top pipe.<br />

4. Undo the siphon plastic union connection.<br />

65 DHW THERMISTOR REPLACEMENT<br />

1. Refer to Frames 52 & 72 for draining the appliance.<br />

2. Swing the control box into the servicing position. Refer<br />

to Frame 46.<br />

3. Drain the DHW circuit. Refer to Frame 72.<br />

4. Unscrew the knurled retaining nut.<br />

5<br />

4<br />

5. Remove the backnut retaining the siphon to the bottom<br />

panel.<br />

6. Fit the new siphon in reverse order ensuring the siphon<br />

is full of water.<br />

7. Check operation of the boiler. Refer to Frame 52.<br />

3<br />

5. Disconnect the in line electrical connection and<br />

withdraw the thermistor.<br />

6. Reassemble in reverse order.<br />

7. Check operation of the boiler. Refer to Frame 52.<br />

4<br />

5<br />

Esprit - Installation and Servicing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!