06.11.2012 Views

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

iDEAl EsPRit - Ideal Heating

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

70 SAFETY RELIEF VALVE REPLACEMENT<br />

1. Refer to Frame 52.<br />

2. Drain the boiler CH circuit. Refer to Frame<br />

72.<br />

3. Unscrew the nut securing the pipe to the<br />

pump outlet.<br />

4. Disconnect the electrical connections.<br />

5. Withdraw the pump clip.<br />

6. Remove screw securing pump through<br />

bottom panel.<br />

7. Pull pump forward to disengage from<br />

manifold and remove.<br />

8. Unscrew the discharge pipe union nut.<br />

9. Unscrew the safety valve retaining screw.<br />

10. Pull the safety valve upwards to remove.<br />

11. Fit the new safety valve and tighten the<br />

securing screw.<br />

12. Reassemble in reverse order.<br />

13. Refill the boiler. Refer to Frame 32.<br />

14. Check operation of the boiler. Refer to<br />

Frame 52.<br />

71 AUTOMATIC AIR VENT REPLACEMENT<br />

1. Refer to Frame 52.<br />

2. Drain the boiler. Refer to frame 72.<br />

3. Remove the turret from the boiler. Refer to<br />

frame 24.<br />

4. Release the silicon tubing from the sample<br />

point.<br />

5. Release the electrical connections from the<br />

spark generator.<br />

6. Remove the M5 x 10 screw retaining the top<br />

flue manifold casting.<br />

7. Remove the top flue manifold casting.<br />

8. Remove the fan from the boiler. Refer to<br />

Frame 47.<br />

9. Remove the burner from the heat exchanger.<br />

Refer to Frame 48.<br />

10. Unscrew the air vent from its heat exchanger<br />

mount and replace.<br />

11. Re assemble the boiler in reverse order.<br />

Esprit - Installation and Servicing<br />

6<br />

SERVICING<br />

5<br />

Fan<br />

5<br />

6<br />

esp8936<br />

Air vent<br />

12. Refill the boiler. Refer to frame 32. Check for<br />

leaks around the new air vent joint.<br />

13. Check the operation of the boiler. Refer to frame 52.<br />

10<br />

4<br />

8<br />

3<br />

Plug<br />

9<br />

51<br />

SERVICING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!