FLUE OUTLET<br />

28<br />

29 ASSEMBLING THE ROOF FLUE KIT<br />

INSTALLATION<br />

Determine the correct height that the flue should terminate<br />

above the roof. If after calculating or measuring the overall flue<br />

height from the top of the boiler, it is necessary to cut both<br />

pipes, then ensure they are cut equally leaving the inner flue<br />

tube longer than the outer air tube as supplied.<br />

Ensure the cut pipe ends are free from any burrs.<br />

1. Position the roof flashing plate (supplied separately) over the<br />

hole cut in the roof and insert flue terminal from the roof end.<br />

Flat roof tile<br />

weather collar<br />

nm8743<br />

1<br />

'X'<br />

Flue Terminal<br />

Pitched roof tile<br />

weather collar<br />

4<br />

nm8740<br />

MAX LENGTH:<br />

7.5m<br />

BOILER<br />

2. Push fit the vertical connector (supplied separately) into the<br />

boiler flue connection and retain with the turret clamp and<br />

securing screw (supplied with the boiler). ENSURING THE<br />

GASKETS IN THE BOILER FLUE OUTLET ARE CORRECTLY<br />

FITTED.<br />

3. "Push" fit extension duct (if required (supplied separately)) into<br />

vertical connector.<br />

2<br />

3<br />

Extension<br />

Duct<br />

Turret<br />

clamp<br />

Vertical<br />

connector<br />

esp8850<br />

4. If the last extension duct requires cutting, measure ‘X’, the distance<br />

(outer ducts), between the duct and the terminal and add 100 mm to<br />

this dimension. This gives the length of the last extension duct.<br />

Note. Check the position of the inner flue duct relative to the outer duct<br />

on the assembled extension duct(s) and ensure the terminal flue duct<br />

is cut longer than the air duct to ensure engagement in the final flue<br />

duct seal.<br />

5. Finally ensure the roof flashing plate is correctly sealed to the roof.<br />

esp8887<br />

min 16 o<br />

max 41 o<br />

Esprit - Installation and Servicing