ARTICLE 100-104<br />
ARTICLE 100 GENERAL <strong>INFORMATION</strong><br />
101. Introduction<br />
The Information and Requirements for Electric Service<br />
booklet is issued to provide a thorough understanding between<br />
NSTAR and its customers, architects, builders, electrical<br />
contractors, consulting engineers and municipal inspectors. It<br />
is also important to stay up to date on NSTAR’s Schedule of<br />
Rates and its Terms and Conditions, as they are filed from time<br />
to time with the Massachusetts Department of Public Utilities<br />
(DPU) and which are subject to change.<br />
102. Scope<br />
The information contained in this booklet applies primarily to<br />
electric service requirements for installations not exceeding<br />
480 volts. Service requirements for installations at higher<br />
voltages are subject to special negotiations with the NSTAR<br />
New Customer Connect Tech Center.<br />
103. Uniform Requirements<br />
Many of NSTAR’s requirements are the same as those of other<br />
electric utilities that serve cities and towns in adjoining<br />
territories. However, differences in some requirements do<br />
exist.To avoid misunderstanding, it is essential that a copy of<br />
the local electric utility company’s requirements be obtained<br />
and followed when work is to be done in its territory.<br />
104. Effective Date<br />
This issue of Information and Requirements for Electric<br />
Service supersedes all previous issues for NSTAR Electric,<br />
Boston Edison, COMElectric and Cambridge Electric and is<br />
effective immediately for all new construction, with reasonable<br />
allowance for the completion of work in progress or already<br />
under contract. NSTAR reserves the right to revise, alter,<br />
amend, add or repeal this information when necessary or<br />
18<br />
ARTICLE 105<br />
appropriate and will endeavor to notify all interested persons.<br />
It will be incumbent upon all interested persons to keep<br />
themselves informed as to such revisions, alterations,<br />
amendments, additions or repeals. NSTAR assumes no<br />
responsibility to notify persons relative to such revisions,<br />
alterations, amendments, additions or repeals.<br />
105. Enforcement of Rules<br />
All wiring intended for connection to the electrical conductors<br />
of NSTAR shall be in accordance with requirements of the<br />
authority having jurisdiction, the Massachusetts Electrical Code<br />
and of NSTAR. Service connection to new customer wiring<br />
installations will not be made until notice of approval of the<br />
new wiring is received from the authority having jurisdiction.<br />
All connections to NSTAR’s system shall be designed, installed<br />
and operated in a manner that will not cause undue<br />
disturbance to other customers, and will not restrict NSTAR<br />
from maintaining proper system conditions. NSTAR reserves<br />
the right to de-energize the service of any customer who, after<br />
proper notice from NSTAR, continues to use any equipment or<br />
apparatus that adversely affects the service of other customers<br />
or any service that has not received approval from the<br />
authority having jurisdiction.<br />
In those instances where the electrician has not satisfactorily<br />
fulfilled the requirements as stated in this manual, designated<br />
employees of NSTAR will, upon receiving approval from the<br />
customer, correct any omission or improper installation.<br />
A charge for any services rendered will be forwarded to the<br />
customer for payment.<br />
In those instances where the electrician has not satisfactorily<br />
fulfilled the requirement as stated in the Massachusetts<br />
19