SKETCH 19<br />
Meter Installation for 200 Amperes, Three Phase, 3 Wire, 240 or<br />
480 Volt Service With 5 Terminal Meter Socket and Bypass<br />
SKETCH 20<br />
Meter Installation for 200 Amperes, Three phase, 4 Wire, 120/208 or<br />
277/480 Volt Service With 7 Terminal Meter Socket and Bypass<br />
LINE<br />
LINE<br />
NA B C<br />
COMMON PHASE<br />
CONNECTION<br />
<strong>SERVICE</strong><br />
NEUTRAL<br />
5th<br />
TERMINAL<br />
BY-PASS<br />
LEVER IN<br />
BY-PASSING<br />
POSITION<br />
<strong>SERVICE</strong><br />
NEUTRAL<br />
BONDED TO<br />
BOX<br />
BY-PASS<br />
LEVER IN<br />
BY-PASSING<br />
POSITION<br />
LOAD<br />
N<br />
A B C<br />
LOAD<br />
1. COMMON PHASE CONNECTION MUST BE INSULATED<br />
FROM THE SOCKET.<br />
On Three Phase Delta only A & C phases are bypassed; B phase is<br />
always energized and 5th terminal permanently attached at 6 o’clock<br />
position.<br />
2. Drain hole in the bottom of meter socket must be punched out.<br />
3. A manual, single handled bar with locking jaw bypass and safety arc<br />
shield is required.<br />
4. 5th Terminal located at 6 o’clock.<br />
128<br />
1. Drain hole in the bottom of meter socket must be punched out.<br />
2. A manual, single handled bar with locking jaw by-pass and safety arc<br />
shield is required.<br />