SKETCH 19<br />

Meter Installation for 200 Amperes, Three Phase, 3 Wire, 240 or<br />

480 Volt Service With 5 Terminal Meter Socket and Bypass<br />

SKETCH 20<br />

Meter Installation for 200 Amperes, Three phase, 4 Wire, 120/208 or<br />

277/480 Volt Service With 7 Terminal Meter Socket and Bypass<br />

LINE<br />

LINE<br />

NA B C<br />

COMMON PHASE<br />

CONNECTION<br />

<strong>SERVICE</strong><br />

NEUTRAL<br />

5th<br />

TERMINAL<br />

BY-PASS<br />

LEVER IN<br />

BY-PASSING<br />

POSITION<br />

<strong>SERVICE</strong><br />

NEUTRAL<br />

BONDED TO<br />

BOX<br />

BY-PASS<br />

LEVER IN<br />

BY-PASSING<br />

POSITION<br />

LOAD<br />

N<br />

A B C<br />

LOAD<br />

1. COMMON PHASE CONNECTION MUST BE INSULATED<br />

FROM THE SOCKET.<br />

On Three Phase Delta only A & C phases are bypassed; B phase is<br />

always energized and 5th terminal permanently attached at 6 o’clock<br />

position.<br />

2. Drain hole in the bottom of meter socket must be punched out.<br />

3. A manual, single handled bar with locking jaw bypass and safety arc<br />

shield is required.<br />

4. 5th Terminal located at 6 o’clock.<br />

128<br />

1. Drain hole in the bottom of meter socket must be punched out.<br />

2. A manual, single handled bar with locking jaw by-pass and safety arc<br />

shield is required.<br />

129