01.01.2015 Views

INFORMATION & REQUIREMENTS ELECTRIC SERVICE - NStar

INFORMATION & REQUIREMENTS ELECTRIC SERVICE - NStar

INFORMATION & REQUIREMENTS ELECTRIC SERVICE - NStar

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX A - SKETCHES INDEX<br />

1. Standby Generator Installation Schematic Connection Diagrams<br />

2. Typical Overhead Service Entrance Facilities<br />

3. Minimum Vertical Service Clearance Above Ground and<br />

Buildings<br />

4. Service Mast Construction at Low Buildings – 400 Amperes or<br />

Less Single Phase Maximum<br />

5. Overhead Service Installation of Service Bolt<br />

6A. Typical Residential Underground Service from Overhead<br />

Facilities on Same Side of Street<br />

6B. Typical Residential Underground Service from Overhead<br />

Facilities on Opposite Side of Street<br />

7. Typical Installation of Underground Service to a Single Building<br />

400 Amperes or Less Fed From Overhead to Underground<br />

Only<br />

8. Typical Installation of Underground Service To A Single Building<br />

400 Amperes Or Less Fed From A Manhole System<br />

9. 800-1000 Ampere Special Terminal Box<br />

10. Required Clearances Around NSTAR Owned Facilities<br />

11. Padmounted Transformer Protection From Vehicular Traffic<br />

12. Temporary Service Structure for Service 200 Amperes or Less<br />

13. Minimum Clearances For All Self-Contained Meter Socket<br />

Installations<br />

14. Residential or Small Commercial Meter Pedestal Installation For<br />

120/240 Volt, 400 Amperes or Less Service<br />

15. Hot and Cold Sequence Diagrams<br />

104<br />

APPENDIX A - SKETCHES INDEX<br />

16. NSTAR Meter Socket/Connection Requirements<br />

17. Meter Installation for 200 Amperes, Single Socket, Single<br />

Phase, 3 Wire, 120/240 or 120/208 Volt Service With 4 or 5<br />

Terminal Meter Socket<br />

18. Meter Installation for 200 Amperes, Multiple Sockets, Single<br />

Phase, 3 Wire, 120/240 or 120/208 Volt Services With 4 or 5<br />

Terminal Meter Sockets<br />

19. Meter Installation for 200 Amperes,Three Phase, 3 Wire, 240<br />

or 480 Volt Service With 5 Terminal Meter Socket and Bypass<br />

20. Meter Installation for 200 Amperes,Three Phase, 4 Wire,<br />

120/208 or 277/480 Volt Service With 7 Terminal Meter<br />

Socket and Bypass<br />

21. Meter Installation for 400 Amperes, Single Phase, 3 Wire,<br />

120/240 or 120/208 Volts With 5 Terminal Meter Socket and<br />

Bypass<br />

22. Meter Installation for 400 Amperes, 3 Phase, 4 Wire, 120/208 or<br />

277/480 Volt Service With 7 Terminal Meter Socket and Bypass<br />

23. Typical Meter Installation Involving Current Transformers One<br />

or More Cable Per Phase Each Cable No Larger Than 500 KCMIL<br />

24. Transformer Rated Meter Installations With Meter Cabinet<br />

Located Outdoors<br />

25. Mounting Provisions and Dimensions For Metering Current<br />

Transformers In Service Cubicles Rated 600 Volts,<br />

1800 Amperes or Less<br />

26. Mounting Provisions and Dimensions For Metering Current<br />

Transformers In Service Cubicles Rated 600 Volts, 2000 –<br />

6000 Amperes<br />

105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!