ARTICLE 709-711<br />

709. Moving or Removing Metering Equipment<br />

Meters, instrument transformers, and other metering devices<br />

are the property of NSTAR. Relocation, removal or alteration<br />

for wiring or connection purposes must be performed by an<br />

authorized employee of NSTAR; except when specific permission<br />

is obtained from NSTAR.Violators will be prosecuted.<br />

When an existing service is “upgraded,” it is the responsibility<br />

of the electrician to ensure that removed meters and accessory<br />

equipment are accessible for return to NSTAR. If metering<br />

equipment is lost or destroyed, NSTAR reserves the right to<br />

seek restitution for all equipment.<br />

710. Meter Connections<br />

The service or line side conductors are always connected to<br />

the top terminals of meter sockets or banks and the load side<br />

conductors to the bottom terminals. A number of typical<br />

connections for socket meter installations are shown in<br />

Sketches 16 through 21. These diagrams show the actual<br />

positions of the jaws for the socket meters.<br />

711. Security<br />

No electrical contractor, electrician, or property owners shall<br />

by-pass a meter socket or install jumpers in a meter socket<br />

without first securing permission from the Meter Operations<br />

Department via the NSTAR New Customer Connect Tech<br />

Center. The contractor shall install a transparent<br />

polycarbonate cover and ring on the socket for the purpose of<br />

safety. NSTAR will install the proper metering once an<br />

application for service, a deposit (where required), and an<br />

inspection by the local inspection authority are all received.<br />

At the time permission is requested, the electrical contractor<br />

shall supply the following information to the NSTAR New<br />

Customer Connect Tech Center:<br />

ARTICLE 711<br />

A. Customer’s name and address<br />

B. Meter number<br />

C. Nature of work<br />

D. Electrician’s name, telephone number, and license number<br />

When performing a service upgrade from a 2 wire to 3 wire,<br />

service, it will be the electrical contractor’s responsibility to see<br />

that the meter is returned undamaged to NSTAR.<br />

An estimated bill for unmetered use will be rendered by NSTAR<br />

based on available data for the number of days the service is<br />

unmetered. Electrical contractors or other persons found bypassing<br />

services or using jumpers without prior permission will<br />

be held responsible for any expenses incurred by NSTAR, and<br />

may be subject to any other redress available to NSTAR.<br />

A. For Single Phase 3 wire, services<br />

Due to the use of an automated meter reading system, meters<br />

cannot be reinstalled by the electrical contractor without first<br />

contacting the NSTAR New Customer Connect Tech Center.<br />

B. Meter Seals<br />

Authority to cut meter seals or other sealing devices is<br />

restricted to authorized NSTAR employees. It is the<br />

responsibility of the electrical contractor to call the NSTAR<br />

New Customer Connect Tech Center and request meter<br />

removal or the cutting of any meter seal or other sealing<br />

device.<br />

Authority may be delegated to other than authorized NSTAR<br />

employees, but only by specific request for a specific<br />

installation. It is the responsibility of the electrical contractor<br />

to call the NSTAR New Customer Connect Tech Center, and<br />

request permission before removing or cutting any meter seal<br />

or other sealing device of NSTAR.<br />