ARTICLE 432<br />
66<br />
For the South and Cambridge Districts:<br />
The customer may pay the cost of furnishing and installing<br />
all primary cable up to the padmount transformer. NSTAR<br />
will own and maintain the primary cable and transformer.<br />
For all of NSTAR:<br />
All other construction on private property including the<br />
terminal box, if any, will be installed, owned and<br />
maintained by the customer.<br />
If NSTAR is required to change the location of the pole on<br />
which an underground service originates, the necessary<br />
charges to the underground service shall be at the<br />
customer’s expense.<br />
G. Overhead Area: Riser Pole On Private Property<br />
The primary conduit from the transformer pad to the riser<br />
pole, including the riser on the pole, will be furnished,<br />
installed (NSTAR’s specifications), owned and maintained<br />
by the customer.The primary cable from the transformer<br />
pad to the riser pole will be furnished, installed and<br />
maintained by NSTAR at customer expense.<br />
H. Underground Area:<br />
For the North District:<br />
The primary conduit from the transformer pad to a point<br />
two feet inside the customer’s property line at a point<br />
designated by NSTAR will be furnished, installed, owned,<br />
and maintained by the customer. NSTAR will extend this<br />
conduit to the underground system. NSTAR will install the<br />
first section of the primary cable from the street manhole<br />
to the padmount transformer on private property and<br />
charge the customer for furnishing and installing the<br />
primary cable beyond 2 feet inside the property line. NSTAR<br />
will maintain this portion of the cable at customer expense.<br />
ARTICLE 432-433<br />
For the South and Cambridge Districts:<br />
The customer will install the primary conduit from the<br />
transformer pad to NSTAR’s distribution facility. NSTAR<br />
will install the first section of the primary cable from the<br />
street manhole to the padmount transformer on private<br />
property and may charge the customer for furnishing and<br />
installing the primary cable beyond 2 feet inside the<br />
property line. Contact the NSTAR New Customer<br />
Connect Tech Center to determine ownership and<br />
maintenance of this portion of the installation.<br />
433. Building Vault<br />
This type of private property installation is available in both<br />
overhead and underground distribution areas in the North<br />
District, excluding the Downtown Boston Network District<br />
(for customer vaults in the Downtown Boston Network<br />
District please contact the NSTAR New Customer Connect<br />
Tech Center). A building vault is required when no space is<br />
available outside the building for a padmount transformer.The<br />
customer shall:<br />
A. Provide vault space within the building large enough to<br />
accommodate NSTAR’s transformer(s) and protective<br />
equipment in an area free from moisture and other<br />
contaminants.Where possible, the vault should be located<br />
on outside walls and have an outside entrance door for<br />
easy access.The vault size, grounding, ventilation,<br />
drainage, access and location must be approved by NSTAR<br />
and the authority having jurisdiction, and be in accordance<br />
with Massachusetts Electric Code.<br />