ARTICLE 722<br />
722. Pad-Mount Metering<br />
Where a new single customer is supplied from a pad-mounted<br />
transformer, NSTAR Meter Operations Department will<br />
consider locating the instrument transformers on the padmounted<br />
distribution transformer. For location of meter<br />
socket and cabinet/enclosure, see Sketch 24.<br />
The customer will furnish and install:<br />
A. Transformer rated meter socket cabinet, which must have<br />
the NSTAR approved label. See Sketch 24 for location.<br />
NSTAR approved transformer rated meter sockets vendor<br />
part numbers (which are subject to change, refer to<br />
www.nstar.com for most current) are:<br />
• Single Phase Form 4S 6 Terminal Meters<br />
Milbank Cat#UC4964-O-WC-21-NST<br />
Meter Devices Cat#602-U3060A-6-717<br />
• Three Phase, 3 Wire Form 5S 8 Terminal Meters<br />
Milbank Cat#UC4965-0-WC-21-NST<br />
Meter Devices Cat#602-U3060A-8-716<br />
Landis & Gyr Siemens Cat #9837-0905<br />
• Three Phase, 4Wire Form 9S 13Terminal Meters<br />
Milbank Cat#UC4966-0-WC-21-NST<br />
Meter Devices Cat#602-U3060A-13-587<br />
Landis &Gyr Siemens Cat#9837-0906<br />
B. A 1 1/2-inch EMT, rigid metal conduit, schedule 40<br />
conduit, or nipple with pull string shall be provided<br />
between the transformer cabinet and the meter test switch<br />
cabinet/enclosure for the instrument transformer secondaries.<br />
The secondary conductor length between the instrument<br />
transformers and the meter shall be kept to a minimum, and<br />
shall not exceed 75 feet.<br />
ARTICLE 723-730<br />
NSTAR will furnish and install meter and transformer<br />
secondary wiring from the current and potential transformers<br />
to the meter test switch.<br />
723. Primary Metering<br />
Specifications and requirements for the delivery of and<br />
acceptance of service at the available primary voltage,<br />
including provisions for primary metering, will be furnished<br />
upon request. Please contact the NSTAR New Customer<br />
Connect Tech Center.<br />
METAL ENCLOSED BUS DUCT SWITCHGEAR 600<br />
VOLTS OR LESS<br />
730. General<br />
Please contact the NSTAR New Customer Connect Tech<br />
Center for proper dimensions and mounting provisions for<br />
metering current transformers for specific applications.<br />
Approved switchgear and other service equipment must have<br />
the following provisions:<br />
A. A barrier that physically isolates the instrument<br />
transformers from all other equipment. (See Sketches 25<br />
and 26)<br />
B. A separate door for the instrument transformer<br />
compartment with padlocking facilities.<br />
C. Each set of current transformers installed must be cold<br />
sequence and have its own service disconnect.<br />
D. NSTAR will require mounting space for metering and<br />
auxiliary equipment. Refer to section 704 and 720. The<br />
secondary conductor length between the instrument<br />
transformers and the meter shall be kept to a minimum<br />
and not exceed 75 feet. A minimum 30 x 30 x 3/4 inch,<br />
90 91