SKETCH 13<br />
Minimum Clearances For All Self-Contained Meter Socket Installations<br />
SKETCH 14<br />
Residential or Small Commercial Meter Pedestal Installation For<br />
120/240 Volt, 400 Amperes or Less Service<br />
1" MINIMUM<br />
OVERHANG<br />
OF PLYWOOD<br />
AROUND<br />
TROUGH<br />
EXPANSION<br />
JOINTS REQUIRED<br />
3'<br />
HORIZONTAL SOCKETS<br />
OR BANKS INDOORS<br />
1. A clear working space area of 3 feet is required in all directions around<br />
the front of all meters, and/or metering cabinets and equipment as<br />
required by Massachusetts Electrical Code to allow reading, testing,<br />
and repairing or replacing of such equipment.<br />
2. All gas meters and associated equipment must be a minimum of 3 feet<br />
from the electrical service and metering equipment.<br />
3. The 8 inch horizontal clearance must be maintained from an adjacent<br />
wall or from any equipment mounted on the wall.<br />
4. Vertical & horizontal clearances between meters must be maintained<br />
when sockets are installed.<br />
5. Taps to 5th terminal to be installed by contractor with a #12 solid<br />
copper or #10 solid aluminum AWG conductor depending on service<br />
conductor, insulated in a white jacket.<br />
122<br />
1. The entire pedestal including meter socket and service conductors furnished are<br />
owned and maintained by the customer.<br />
2. A clear work area of three feet is required in all directions of the meter pedestal.<br />
3. All terminal boxes to be sized per the Massachusetts Electrical Code<br />
(if applicable).<br />
4. Pedestal must maintain a minimum clearance of 4 feet from utility poles, and<br />
transformers.<br />
5. The 3/4 inch pressure treated or equal plywood panel board shall be sized to<br />
accommodate the meter socket, a terminal box and service disconnect device<br />
(if applicable).<br />
6. A service disconnect may be required in accordance with Massachusetts Electric<br />
Code. If a service disconnect is being installed, it is subject to the following:<br />
a. Installation is subject to the authority having jurisdiction.<br />
b. It shall be installed on the line side of the meter.<br />
c. The bottom of the disconnect switch shall be physically mounted no lower<br />
than three feet from the finished grade.<br />
7. Installation of pedestal subject to the approval of the authority having<br />
jurisdiction.<br />