ARTICLE 422 ARTICLE 423<br />
agreement. Contact the NSTAR New Customer Connect Tech<br />
Center for details on the electric line extension policies.<br />
Developers interested in an underground distribution system in<br />
a commercial project should contact the NSTAR New<br />
Customer Connect Tech Center at least one (1) year before the<br />
desired service date.<br />
Developers in the South district should refer to the following manuals:<br />
Underground Distribution System Specification 4-0385 (UDS)<br />
and Commercial Underground Distribution System<br />
Specification 1-0796 (CUDS) for more details.<br />
Residential:<br />
A developer may apply for an underground line extension to<br />
service a residential real estate development. Upon<br />
completion of the installation, all non-electric facilities<br />
installed by the customer in the future public way will be<br />
transferred to NSTAR for ownership and maintenance. In<br />
certain cases in the South districts where the customer installs<br />
conduit on private property to be used for primary cable and<br />
that conduit will always be accessible to NSTAR crews,<br />
ownership of that conduit will also be transferred to NSTAR.<br />
Transfer of ownership is subject to inspections and/or tests as<br />
required and approved by NSTAR.<br />
In the South districts, the developer may construct an<br />
underground line extension, including the electric facilities per<br />
NSTAR specifications using an NSTAR approved contractor<br />
and transfer these facilities to NSTAR for ownership and<br />
maintenance. The underground service cable from the<br />
customer’s property line to the service entrance shall be<br />
owned and maintained by the customer.<br />
Commercial:<br />
The developer shall install, own and maintain all underground<br />
non-electric facilities and secondary service systems at the<br />
developer’s expense.<br />
NSTAR will install, own and maintain the primary cable and<br />
transformers, when such facilities are required or in the South<br />
districts the developer may construct an underground line<br />
extension per NSTAR specifications and transfer the primary<br />
cable system to NSTAR for ownership and maintenance.<br />
Transfer of ownership is subject to inspections and/or tests as<br />
required and approved by NSTAR.<br />
423. Underground Secondary Service from NSTAR<br />
Overhead Lines<br />
The entire expense of supplying the underground service<br />
conductors from the point of termination on the pole to the<br />
customer’s building or structure, including installation of a<br />
handhole at the property line, shall be borne by the customer.<br />
The customer shall own and maintain the underground service<br />
from the property line or handhole to the building. NSTAR<br />
will assume ownership and maintenance responsibility from the<br />
pole to the handhole for residential services. NSTAR will make<br />
the final connections to its facilities after approval is received<br />
from the authority having jurisdiction for the customer-owned<br />
portion of the service. Some services will require a junction<br />
box. Contact the NSTAR New Customer Connect Tech Center<br />
for additional details. (See Sketches 6A and 6B)<br />
When more than one underground service is anticipated,<br />
NSTAR will provide the oversized wire to be installed from the<br />
handhole to the pole. Contact the NSTAR New Customer<br />
Connect Tech Center for additional details.<br />