19.01.2015 Views

PAWTUCKET DOWNTOWN DESIGN PLAN FINAL ... - VHB.com

PAWTUCKET DOWNTOWN DESIGN PLAN FINAL ... - VHB.com

PAWTUCKET DOWNTOWN DESIGN PLAN FINAL ... - VHB.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proposed signs and locations<br />

6<br />

7<br />

8<br />

6<br />

7<br />

8<br />

Two signs at I-95 Exit 29 at Fountain Street that direct drivers to the Armory, Slater Mill, City Hall, & Downtown and<br />

Fountain Street, North on ramp to I-95, RI Antiques, & Massachusetts.<br />

Two signs located on Broadway at Exchange Street that help visitors to find Downtown, City Hall, the Visitor’s<br />

Center, & Slater Mill, and the Armory, Dexter, Broad & Exchange Streets.<br />

Two signs at Main and High Street that help people find the Visitor Center, Slater Mill, City Hall, & I-95, and the<br />

Library, the YMCA & Exchange Street.<br />

PDDP <strong>FINAL</strong> REPORT<br />

115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!