CURB TO CURB<br />

LANDSCAPE<br />

Description Unit-of-Measure Unit Cost Quantity Cost<br />

R&D sidewalks sy 5 8000 40,000<br />

concrete sidewalks sf 10 16000 160,000<br />

granite transition bands lf 40 800 32,000<br />

unit pavers sf 20 8000 160,000<br />

assume cobbles from city stockpile or new brick pavers<br />

trees and struct. soil each 1,000 0 0<br />

furnishings allow 1 0 30,000<br />

planters, trash cans, bike racks<br />

benches allow 1 0 0<br />

lighting each 10,000 0 0<br />

downtown gateway each 120,000 1 120,000<br />

public art not included<br />

park place gateway each 80,000 1 80,000<br />

public art not included<br />

TOTAL $ 422,000<br />