CURB TO CURB<br />

LANDSCAPE<br />

Description Unit-of-Measure Unit Cost Quantity Cost<br />

NORTH SIDE ITEMS<br />

R&D sidewalks sy 5 3000 $ 15,000<br />

concrete sidewalks sf 10 0 0<br />

asphalt bike lanes sf 10 2600 26,000<br />

granite transition bands lf 40 600 24,000<br />

unit pavers sf 25 3000 75,000<br />

trees and struct. soil each 1,000 5 5,000<br />

Tolman Square allow 80,000 1 80,000<br />

SOUTH SIDE ITEMS<br />

$ 225,000<br />

R&D sidewalks sy 10 3000 30,000<br />

concrete sidewalks sf 10 0 0<br />

asphalt bike lanes sf 0 0 0<br />

granite transition bands lf 30 600 18,000<br />

unit pavers sf 25 3000 75,000<br />

trees and struct. soil each 1,000 22 22,000<br />

$ 145,000<br />

Notes:<br />

1. Assume sidewalk ribbon to remain.<br />

2. Bike lane estimate for on walk only.<br />

<strong>FINAL</strong> REPORT - APPENDIX<br />

TOTAL $ 370,000<br />