- Page 1:
26 May 2011 City of Pawtucket Plann
- Page 4 and 5:
TABLE OF CONTENTS INTRODUCTION VISI
- Page 6 and 7:
P P P P P P EXECUTIVE SUMMARY Pawtu
- Page 8 and 9:
TURNPIKE SYSTEM COMPONENTS and tree
- Page 11 and 12:
INTRODUCTION EXISTING CONDITIONS Th
- Page 13 and 14:
WEST AVE. PINE ST. ST. CT. ST. REET
- Page 15 and 16:
Greenspace Sidewalks are the primar
- Page 17 and 18:
Downtown does not have a traffic am
- Page 19:
cars there all day. This disrupts t
- Page 23 and 24:
INTRODUCTION CONCEPTS Rather than d
- Page 25 and 26:
Historic Turnpike Routes Valley Fal
- Page 27 and 28:
Segments of Turnpike Routes BROAD H
- Page 29 and 30:
Views of existing and proposed Main
- Page 31 and 32:
PROJECT 2 : TAKE THE EXCHANGE PDDP
- Page 33 and 34:
Exchange Segments BROAD HIGH ROOSEV
- Page 35 and 36:
Views of existing and proposed Exch
- Page 37 and 38:
PROJECT 3 : “P”ARKING The above
- Page 39 and 40:
MAIN Public parking lots to be sign
- Page 41 and 42:
PROJECT 4 : ENJOY THE RIVERWAY The
- Page 43 and 44:
MAIN Proposed Riverway components H
- Page 45:
CG PROJECT 5 USE DOWNTOWN GUIDANCE
- Page 48 and 49:
VISION Defining Scope PREFERRED ALT
- Page 50 and 51:
MAIN Exchange Street Scope Priority
- Page 53 and 54:
DESIGN
- Page 55:
MAIN Scope of the PDDP Projects BRO
- Page 58 and 59:
DESIGN Traffic & Street Improvement
- Page 60 and 61:
DESIGN Traffic & Street Improvement
- Page 62 and 63:
DESIGN Traffic & Street Improvement
- Page 64 and 65:
PROPOSED LOCATION OF BLACKSTONE VAL
- Page 66 and 67:
DESIGN Traffic & Street Improvement
- Page 68 and 69:
CONNECTION TO RE-ALIGNED PARK PLACE
- Page 70 and 71:
DESIGN Traffic & Street Improvement
- Page 72 and 73:
George Street and Park Place West a
- Page 74 and 75:
DESIGN Traffic & Street Improvement
- Page 76 and 77:
NEW TREES NEW PARKING 3” RAISED C
- Page 78 and 79:
DESIGN Traffic & Street Improvement
- Page 80 and 81:
TRAFFIC & STREET IMPROVEMENTS CONCL
- Page 82 and 83:
DESIGN Public Parking Management PA
- Page 84 and 85:
DESIGN Public Parking Management de
- Page 86 and 87:
DESIGN Public Parking Management PA
- Page 88 and 89:
Roosevelt Avenue Parking Lot RECOMM
- Page 90 and 91:
Broad Street and Humes Street Parki
- Page 92 and 93:
PUBLIC PARKING MANAGEMENT CONCLUSIO
- Page 94 and 95:
DESIGN Bicycle & Transit Systems BI
- Page 96 and 97: Bicycle parking types At each of th
- Page 98 and 99: DESIGN Bicycle & Transit Systems TR
- Page 100 and 101: TRANSIT SYSTEMS CONCLUSION Enhancin
- Page 102 and 103: DESIGN Streetscape and Pedestrian S
- Page 104 and 105: DESIGN Streetscape and Pedestrian S
- Page 106 and 107: Existing lighting conditions EXCHAN
- Page 108 and 109: DESIGN Streetscape and Pedestrian S
- Page 110 and 111: DESIGN Streetscape and Pedestrian S
- Page 112 and 113: Full replacement signs would be use
- Page 114 and 115: DESIGN Streetscape and Pedestrian S
- Page 116 and 117: Proposed sign type From the Highcha
- Page 118 and 119: DESIGN Streetscape and Pedestrian S
- Page 120 and 121: STREETSCAPE AND PEDESTRIAN SYSTEMS
- Page 122 and 123: DESIGN Landscape LANDSCAPE PLAN GOA
- Page 124 and 125: DESIGN Streetscape and Pedestrian S
- Page 126 and 127: DESIGN Landscape TREE ORDINANCE GOA
- Page 128 and 129: PROPOSED TREE LIST (PARTIAL) OUTSID
- Page 130 and 131: DESIGN Landscape ECOLOGICAL GREEN S
- Page 132 and 133: DESIGN Landscape RIVERWAY COMPONENT
- Page 134 and 135: DESIGN Landscape BRIDGE PARK EAST G
- Page 136 and 137: B Bridge Park East plan and section
- Page 138 and 139: DESIGN Landscape PARK PLACE RE-ALIG
- Page 140 and 141: LANDSCAPE CONCLUSION The PDDP team
- Page 142 and 143: DESIGN Regulatory Framework The PDD
- Page 144 and 145: Enhance design requirements The rev
- Page 148 and 149: STATUS AND IMPLEMENTATION Projects
- Page 150 and 151: PROJECTS LIST - BY TIMELINE Project
- Page 152 and 153: STATUS AND IMPLEMENTATION Projects
- Page 154 and 155: STATUS AND IMPLEMENTATION Projects
- Page 156 and 157: STATUS AND IMPLEMENTATION Projects
- Page 159 and 160: APPENDIX
- Page 161 and 162: APPENDIX A PROPOSED AMENDMENTS TO T
- Page 163 and 164: FINAL REPORT - APPENDIX 161
- Page 165 and 166: FINAL REPORT - APPENDIX 163
- Page 167 and 168: FINAL REPORT - APPENDIX 165
- Page 169 and 170: FINAL REPORT - APPENDIX 167
- Page 171 and 172: FINAL REPORT - APPENDIX 169
- Page 173 and 174: FINAL REPORT - APPENDIX 171
- Page 175 and 176: FINAL REPORT - APPENDIX 173
- Page 177 and 178: FINAL REPORT - APPENDIX 175
- Page 179 and 180: FINAL REPORT - APPENDIX 177
- Page 181 and 182: FINAL REPORT - APPENDIX 179
- Page 183 and 184: FINAL REPORT - APPENDIX 181
- Page 185 and 186: FINAL REPORT - APPENDIX 183
- Page 187 and 188: FINAL REPORT - APPENDIX 185
- Page 189 and 190: APPENDIX B PROPOSED AMENDMENTS TO T
- Page 191 and 192: FINAL REPORT - APPENDIX 189
- Page 193 and 194: FINAL REPORT - APPENDIX 191
- Page 195 and 196: FINAL REPORT - APPENDIX 193
- Page 197 and 198:
FINAL REPORT - APPENDIX 195
- Page 199 and 200:
FINAL REPORT - APPENDIX 197
- Page 201 and 202:
FINAL REPORT - APPENDIX 199
- Page 203 and 204:
FINAL REPORT - APPENDIX 201
- Page 205 and 206:
FINAL REPORT - APPENDIX 203
- Page 207 and 208:
FINAL REPORT - APPENDIX 205
- Page 209 and 210:
FINAL REPORT - APPENDIX 207
- Page 211 and 212:
FINAL REPORT - APPENDIX 209
- Page 213 and 214:
FINAL REPORT - APPENDIX 211
- Page 215 and 216:
FINAL REPORT - APPENDIX 213
- Page 217 and 218:
FINAL REPORT - APPENDIX 215
- Page 219 and 220:
FINAL REPORT - APPENDIX 217
- Page 221 and 222:
FINAL REPORT - APPENDIX 219
- Page 223 and 224:
FINAL REPORT - APPENDIX 221
- Page 225 and 226:
FINAL REPORT - APPENDIX 223
- Page 227 and 228:
FINAL REPORT - APPENDIX 225
- Page 229 and 230:
FINAL REPORT - APPENDIX 227
- Page 231 and 232:
APPENDIX C DOWNTOWN DESIGN GUIDELIN
- Page 233 and 234:
PARKING MINIMUM SETBACK BUILDING SM
- Page 235 and 236:
BUILDABLE LOT WITHOUT A SIDE SETBAC
- Page 237 and 238:
UNDESIRABLE DESIRABLE FIGURE 6: The
- Page 239 and 240:
APPENDIX D RECIRCULATED 2010 TRAFFI
- Page 241 and 242:
FINAL REPORT - APPENDIX 239
- Page 243 and 244:
FINAL REPORT - APPENDIX 241
- Page 245 and 246:
FINAL REPORT - APPENDIX 243
- Page 247 and 248:
FINAL REPORT - APPENDIX 245
- Page 249 and 250:
FINAL REPORT - APPENDIX 247
- Page 251 and 252:
FINAL REPORT - APPENDIX 249
- Page 253 and 254:
FINAL REPORT - APPENDIX 251
- Page 255 and 256:
FINAL REPORT - APPENDIX 253
- Page 257 and 258:
FINAL REPORT - APPENDIX 255
- Page 259 and 260:
FINAL REPORT - APPENDIX 257
- Page 261 and 262:
FINAL REPORT - APPENDIX 259
- Page 263 and 264:
APPENDIX E DETAILED COST ESTIMATES
- Page 265 and 266:
CURB TO CURB LANDSCAPE Description
- Page 267 and 268:
CURB TO CURB LANDSCAPE Description
- Page 269 and 270:
CURB TO CURB FINAL REPORT - APPENDI
- Page 271 and 272:
CURB TO CURB LANDSCAPE Description
- Page 273 and 274:
CURB TO CURB ONLY FINAL REPORT - AP
- Page 276:
Thurlow Small Architecture L + A La