CURB TO CURB<br />

LANDSCAPE<br />

Description Unit-of-Measure Unit Cost Quantity Cost<br />

R&D sidewalks sy 5 25000 125,000<br />

concrete sidewalks sf 10 20000 200,000<br />

granite transition bands lf 40 2000 80,000<br />

unit pavers sf 20 9000 180,000<br />

assume cobbles from city stockpile<br />

trees and struct. soil each 1,000 60 60,000<br />

furnishings allow 1 30000 30,000<br />

planters, trash cans, bike racks<br />

benches allow 1 20000 20,000<br />

lighting each 10,000 25 250,000<br />

TOTAL $ 945,000<br />

<strong>FINAL</strong> REPORT - APPENDIX<br />

263