19.01.2015 Views

PAWTUCKET DOWNTOWN DESIGN PLAN FINAL ... - VHB.com

PAWTUCKET DOWNTOWN DESIGN PLAN FINAL ... - VHB.com

PAWTUCKET DOWNTOWN DESIGN PLAN FINAL ... - VHB.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proposed Riverway system<br />

HIGH<br />

ROOSEVELT<br />

BROAD<br />

EXCHANGE<br />

TOLMAN<br />

HS<br />

BROADWAY<br />

MAIN<br />

SLATER<br />

MILL<br />

APEX<br />

PROPERTY<br />

DIVISION<br />

GEORGE<br />

TOWN<br />

LANDING<br />

PLEASANT<br />

NATIONAL GRID<br />

FESTIVAL PIER<br />

The riverway <strong>com</strong>ponents include existing public property locations such as the Town Landing, the Festival Pier, the new<br />

public right of way on the east side of the Blackstone River next to the Apex property, up to the Slater Mill property and<br />

to Tolman High School. The orange shows the areas for special elements that allow visual connection or pedestrians to<br />

the river including a potential pedestrian and bicycle bridge that connects the east and west sides of the river below the<br />

Division Street bridge.<br />

40<br />

Riverway connection paths<br />

Existing public sites for riverway<br />

Existing Tree Canopy in proposed riverway sites<br />

Riverway river view points<br />

Proposed RIDOT Blackstone Valley Bikeway<br />

Potential future or affiliated riverway sites<br />

New public landscape areas<br />

PDDP VISION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!