north of the intersection to be continuous with the Pleasant Street alignment<br />

and the East Avenue Extension northbound approach will be<strong>com</strong>e the minor<br />

leg at this T-intersection. The traffic island currently separating northbound<br />

and southbound vehicles on Pleasant Street will be removed. Sharrows (or<br />

bike lanes width permitting) will be added on the east side of Pleasant Street<br />

and carried through the intersection onto East Avenue Extension. Pedestrian<br />

crossings will be provided across all legs of the intersection.<br />

Main Street at High Street and East Avenue Extension<br />

The main focus of the proposed improvements at this intersection is to improve<br />

the flow of traffic by introducing two-way traffic flow on all approaches. Longterm<br />

improvements include geometric improvements to the intersection and<br />

the introduction of two-way travel on Main Street, west of the intersection.<br />

The exclusive westbound left-turn lane introduced in the short-term<br />

improvements will be converted to a through-left lane, allowing vehicles to<br />

continue westbound through the intersection on Main Street. The curb radii<br />

of the northwest and southwest corners will be increased to ac<strong>com</strong>modate<br />

buses turning westerly onto Main Street from High Street and East Street.<br />

The alignment of Main Street east of the intersection will be shifted slightly to<br />

the south and the northeast corner curb radius will be decreased in order to<br />

reduce the length of the pedestrian crossings, which will be provided across all<br />

legs of the intersection.<br />

Summer Street at High Street<br />

Two-way travel will be introduced on High Street south of the Summer Street<br />

intersection as part of the long-term East Avenue Extension improvements.<br />

The proposed improvements at this intersection focus on ac<strong>com</strong>modating the<br />

two-way travel patterns on High Street south of Summer Street. Under existing<br />

conditions, High Street ac<strong>com</strong>modates two-way travel north of the Summer<br />

Street intersection. The existing traffic island in the middle of the intersection<br />

will be removed to allow vehicles to continue southbound on High Street<br />

through the intersection. Existing on-street parking will be retained on Summer<br />

Street and High Street. A curb bump-out is proposed along the east side of<br />

High Street to calm traffic and reduce the length of pedestrian crossings. Also,<br />

the southwest corner curb radius will be significantly decreased to reduce the<br />

length of pedestrian crossings, which will be provided across all legs of the<br />

intersection.<br />

EXISTING GEORGE STREET AND EAST<br />

AVENUE EXTENSION INTERSECTION<br />

PDDP <strong>FINAL</strong> REPORT<br />