20.01.2015 Views

minutes of a meeting of warringah council held on tuesday, 21 may ...

minutes of a meeting of warringah council held on tuesday, 21 may ...

minutes of a meeting of warringah council held on tuesday, 21 may ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

:\data\creports\<str<strong>on</strong>g>minutes</str<strong>on</strong>g>\200205<strong>21</strong>m.doc\13<br />

Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> Local Approvals Committee Meeting <strong>on</strong> <strong>21</strong> May 2002<br />

11. The footpath is to be protected from surface water by the c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a grated drain<br />

across the driveway within the boundary c<strong>on</strong>nected to the drainage system. (C102)<br />

12. All c<strong>on</strong>structi<strong>on</strong> and restorati<strong>on</strong> work <strong>on</strong> Council’s road and footpath area are to be<br />

carried out in accordance with the approved drawings and Council’s Standard<br />

Specificati<strong>on</strong>s. (C110)<br />

13. All disturbed areas adjacent to the works <strong>on</strong> Council’s road and footpath are to be<br />

restored to the satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Principal Certifying Authority. (C111)<br />

14. The total cost <str<strong>on</strong>g>of</str<strong>on</strong>g> all c<strong>on</strong>structi<strong>on</strong> and restorati<strong>on</strong> works <strong>on</strong> Council’s road and footpath<br />

shall be borne by the developer/applicant. (C112)<br />

15. A C<strong>on</strong>sultant Engineer’s Certificate is to be supplied to the Principal Certifying<br />

Authority <strong>on</strong> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the following stages <str<strong>on</strong>g>of</str<strong>on</strong>g> works and/or as and when requested<br />

by the Principal Certifying Authority.<br />

• Laying <str<strong>on</strong>g>of</str<strong>on</strong>g> stormwater pipes and c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pits for interallotment drainage<br />

16. C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> approved kerb laybacks in accordance with the details shown <strong>on</strong><br />

Warringah Council Plan A4-2276. (C90)<br />

17. Reinstatement <str<strong>on</strong>g>of</str<strong>on</strong>g> redundant crossings and laybacks prior to issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the final<br />

Compliance Certificate. (C91)<br />

18. The submissi<strong>on</strong> to Council or the private certifier <str<strong>on</strong>g>of</str<strong>on</strong>g> four (4) copies <str<strong>on</strong>g>of</str<strong>on</strong>g> Civil<br />

Engineering plans for the design <str<strong>on</strong>g>of</str<strong>on</strong>g> stormwater drainage works required in the existing<br />

driveway including l<strong>on</strong>g and cross secti<strong>on</strong>s, details <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed structures and<br />

specificati<strong>on</strong>s.<br />

Such design shall be:<br />

a. Prepared and submitted <strong>on</strong> A1 size sheets,<br />

b. Undertaken by a C<strong>on</strong>sulting Civil Engineer (or by such other pers<strong>on</strong> as <strong>may</strong> be<br />

approved by Council),<br />

c. Approved and stamped by Council or the private certifier prior issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

c<strong>on</strong>structi<strong>on</strong> certificate,<br />

d. Subject to the prescribed Engineering Development Fees paid to Council prior to<br />

the release <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certificate (to be paid into Account WCP 20340<br />

0999),<br />

e. Up<strong>on</strong> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the works, the applicant is to provide to Council 2 copies <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

“work as executed plans”. The plans are to show relevant dimensi<strong>on</strong>s and<br />

finished levels and are to be certified by a surveyor. Also the applicant is to<br />

provide to Council in an approved format details <str<strong>on</strong>g>of</str<strong>on</strong>g> all public infrastructure<br />

created as part <str<strong>on</strong>g>of</str<strong>on</strong>g> the works,<br />

f. All Civil Engineering works in the existing driveway are to be fully supervised by<br />

the c<strong>on</strong>sultant resp<strong>on</strong>sible for their design, or by such pers<strong>on</strong> as <strong>may</strong> be approved<br />

by Council, and <strong>on</strong> completi<strong>on</strong> certified to be in accordance with the approved<br />

plans, c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> and Council’s standard specificati<strong>on</strong> for<br />

engineering works,<br />

g. A maintenance period <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) m<strong>on</strong>ths shall apply to the work, after it has been<br />

completed and approved in writing by Council or the Principal Certifying<br />

Authority. In that period the applicant shall be liable for any part <str<strong>on</strong>g>of</str<strong>on</strong>g> the work<br />

which fails to perform in the manner outlined in Council’s specificati<strong>on</strong>s, or as<br />

would reas<strong>on</strong>ably be expected under the design c<strong>on</strong>diti<strong>on</strong>s.<br />

Council will require a Security Deposit/Bank Guarantee prior to issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the final<br />

PAGE 13 Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> Warringah Council Meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> <strong>21</strong> May 2002

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!