:\data\creports\<str<strong>on</strong>g>minutes</str<strong>on</strong>g>\200205<strong>21</strong>m.doc\34<br />

Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> Local Approvals Committee Meeting <strong>on</strong> <strong>21</strong> May 2002<br />

Record <str<strong>on</strong>g>of</str<strong>on</strong>g> Voting<br />

For: Crs J<strong>on</strong>es, J Sutt<strong>on</strong>, Caputo, Colman, Forrest, Moxham, Smith, Stephens<br />

and R Sutt<strong>on</strong>.<br />

Against: Nil<br />

6.9 NO 14 PEPPERCORN DRIVE, FRENCHS FOREST –<br />

CONSTRUCTION OF A NEW DWELLING<br />

(BP REF B144)<br />

(File: PF 3819/14-D)<br />

RECOMMENDATION OF LOCAL APPROVALS SERVICE UNIT MANAGER<br />

That the applicati<strong>on</strong> for New Dwelling at Lot 102, DP 1008935, No. 14 Peppercorn Drive,<br />

Frenchs Forest, be approved subject to the following c<strong>on</strong>diti<strong>on</strong>s.<br />

1. Development being generally in accordance with plans Drawing No 2033 ‘B’, Sheet 1<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> 5 (amended ‘A” FEB 02 & ‘B’ APRIL 02) and Sheets 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> 5 to 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> 5, dated 10/01,<br />

submitted 12 November 2001 as modified by any c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> this c<strong>on</strong>sent/approval.<br />

(C1)<br />

2. A C<strong>on</strong>structi<strong>on</strong> Certificate is required to be approved by either Council or an<br />

Accredited Certifier, prior to the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> the site. (C165)<br />

3. Compliance with Building Code <str<strong>on</strong>g>of</str<strong>on</strong>g> Australia<br />

a. All building work must be carried out in accordance with the provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

Building Code <str<strong>on</strong>g>of</str<strong>on</strong>g> Australia.<br />

b. This clause does not apply to the extent to which an exempti<strong>on</strong> is in force under<br />

Clause 80H or 80I, subject to the terms <str<strong>on</strong>g>of</str<strong>on</strong>g> any c<strong>on</strong>diti<strong>on</strong> or requirement referred<br />

to in Clause 80H (6) or 80I (4). (C375)<br />

4. No fill to be placed outside the building footprint as marked in red <strong>on</strong> the approved<br />

plans. The C<strong>on</strong>structi<strong>on</strong> Certificate plans to be amended to indicate compliance. All<br />

excess fill to be removed from the site and deposited in an approved landfill locati<strong>on</strong> to<br />

the satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the principle certifying authority.<br />

5. Compliance Certificates are required at the following stages <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>:-<br />

a. Preliminary - immediately following the setting out <str<strong>on</strong>g>of</str<strong>on</strong>g> the development footprint<br />

prior to excavati<strong>on</strong> and/or formati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> footings or slabs with envir<strong>on</strong>mental<br />

protecti<strong>on</strong> measures and toilet facilities installed.<br />

b. Building Envelope - completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the envelope skelet<strong>on</strong> prior to fixing <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

internal linings (where applicable).<br />

c. Installati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> stormwater system prior to backfilling.<br />

d. Final - prior to occupati<strong>on</strong>/use, the satisfactory completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the building works<br />

with respect to:-<br />

(i) Compliance Certificates as nominated<br />

(ii) Compliance Certificates (comp<strong>on</strong>ents) as nominated (C396)<br />

PAGE 34 Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> Warringah Council Meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> <strong>21</strong> May 2002