:\data\creports\<str<strong>on</strong>g>minutes</str<strong>on</strong>g>\200205<strong>21</strong>m.doc\26<br />
Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> Local Approvals Committee Meeting <strong>on</strong> <strong>21</strong> May 2002<br />
arise out <str<strong>on</strong>g>of</str<strong>on</strong>g> or in c<strong>on</strong>sequence <str<strong>on</strong>g>of</str<strong>on</strong>g> carrying out the work and against all claims, demands,<br />
proceedings, costs, charges and expenses whatsoever in respect there<str<strong>on</strong>g>of</str<strong>on</strong>g> or in relati<strong>on</strong><br />
thereto.<br />
In this regard, the developer/applicant shall take out a public liability policy during the<br />
currency <str<strong>on</strong>g>of</str<strong>on</strong>g> all the works, in the sum <str<strong>on</strong>g>of</str<strong>on</strong>g> not less than $5,000,000 endorsed with Council<br />
as principal, and keep such policy in force at his own expense. A certificate from the<br />
developer/applicant’s insurers to this effect is to be lodged with Council before any<br />
work is commenced.<br />
The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> Comm<strong>on</strong> Law Liability insurance shall be unlimited. (C119)<br />
DURING WORKS<br />
49. Hours <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> and demoliti<strong>on</strong> being restricted to 7am to 5pm M<strong>on</strong>day to Friday,<br />
Saturday 7am to 1pm if audible at residential premises. No audible c<strong>on</strong>structi<strong>on</strong> work<br />
and no demoliti<strong>on</strong> work to take place outside these hours. (C326)<br />
50. Provisi<strong>on</strong> shall be made throughout the period <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> to prevent transmissi<strong>on</strong><br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> soil to the public road and drainage system by vehicles leaving the site. (C44)<br />
51. Dust c<strong>on</strong>trol measures shall be undertaken <strong>on</strong> all demoliti<strong>on</strong> sites so as to avoid a<br />
nuisance to adjoining properties and harm to the envir<strong>on</strong>ment. (C529)<br />
52. A pers<strong>on</strong> taking down, demolishing or causing to be taken down or demolished any<br />
building or part there<str<strong>on</strong>g>of</str<strong>on</strong>g> shall, up<strong>on</strong> identifying or suspecting that asbestos is present in<br />
the building, immediately notify the Work Cover Authority. The Authority is the<br />
c<strong>on</strong>trolling body for the safe removal, handling and disposal <str<strong>on</strong>g>of</str<strong>on</strong>g> asbestos. The Authority<br />
supervises and m<strong>on</strong>itors c<strong>on</strong>tractors engaged in asbestos removal. The requirements<br />
and standards imposed by the Authority, its c<strong>on</strong>sultants or c<strong>on</strong>tractors shall be complied<br />
with. (C530)<br />
53. Signs to be Erected <strong>on</strong> Building and Demoliti<strong>on</strong> Sites. (C382)<br />
a. A sign must be erected in a prominent positi<strong>on</strong> <strong>on</strong> any work site <strong>on</strong> which work<br />
involved in the erecti<strong>on</strong> or demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a building is being carried out:<br />
(i) stating that unauthorised entry to the work site is prohibited, and<br />
(ii) showing the name <str<strong>on</strong>g>of</str<strong>on</strong>g> the pers<strong>on</strong> in charge <str<strong>on</strong>g>of</str<strong>on</strong>g> the work site and a teleph<strong>on</strong>e<br />
number at which that pers<strong>on</strong> <strong>may</strong> be c<strong>on</strong>tacted outside working hours.<br />
b. Any such sign is to be removed when the work has been completed.<br />
c. This clause does not apply to:<br />
(i)<br />
(ii)<br />
building work carried out inside an existing building, or<br />
building work carried out <strong>on</strong> premises that are to be occupied c<strong>on</strong>tinuously<br />
(both during and outside working hours) while the work is being carried out.<br />
54. Adequate protecti<strong>on</strong> measures are to be employed to retain excavated areas during the<br />
c<strong>on</strong>structi<strong>on</strong> process. (C37)<br />
55. All vehicle access for the c<strong>on</strong>structi<strong>on</strong> period shall be c<strong>on</strong>fined to a stabilised<br />
entry/exit/crossing and driveway 4 metres wide installed and maintained to the<br />
reas<strong>on</strong>able satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Council or the principal certifying authority to prevent<br />
damage to the Council road (C107)<br />
56. Footpath and roadway being kept free <str<strong>on</strong>g>of</str<strong>on</strong>g> obstructi<strong>on</strong> by building materials and plant.<br />
All c<strong>on</strong>crete trucks, pumps and/or agitators being kept wholly within the building site.<br />
No c<strong>on</strong>crete or slurry being discharged <strong>on</strong>to Council's street surfaces, nature strips,<br />
drains/gutters, reserves parks etc. (C3<strong>21</strong>)<br />
PAGE 26 Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> Warringah Council Meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> <strong>21</strong> May 2002