Space Shuttle Program Historic Properties 6-38<br />

NASA Kennedy Space Center<br />

Photo 6.29. Rotation/Processing Building, north work area.<br />

(Source: Archaeological Consultants, Inc., 2006)<br />

The 18,000 ft 2 Rotation/Processing Building is constructed of corrugated metal sheeting<br />

supported by a steel frame. It rests on a poured concrete slab foundation and has a flat,<br />

built-up roof. A set of railroad tracks, used to transport the horizontal SRB segments,<br />

passes through the building along the east-west axis. A six-level platform assembly sits<br />

along the north elevation. Two ceiling-mounted cranes aid in the rotation of the SRBs.<br />

The associated control room is on the south wall.<br />

The Rotation/Processing Building, classified within the Vehicle Processing Facilities<br />

property type, is considered individually eligible for listing in the NRHP in the context of<br />

the U.S. Space Shuttle Program (1969-2010) under Criterion A in the area of Space<br />

Exploration and under Criterion C in the area of Engineering. Because the facility has<br />

achieved exceptional significance within the past 50 years, Criteria Consideration G<br />

applies. The Rotation/Processing Building was specifically designed for the purpose of<br />

rotating the SRB segments, an operation vital to the preparation of the launch vehicle for<br />

its mission. Under Criterion C, the building derives its significance from the specially<br />

designed workstands and platforms. The facility is in excellent condition and maintains<br />

integrity of location, design, setting, materials, workmanship, feeling, and association.<br />

6.2.20 SRB Assembly and Refurbishment (ARF) Manufacturing Building (8BR1998)<br />

The SRB ARF Manufacturing Building was designed by USBI-BPC and RS&H.<br />

Construction, managed by USBI-BPC and the Federal Construction Company, was<br />

completed in 1986. This building is located at the southeast corner of Schwartz Road and<br />

Contractors Road, to the east of the VAB Area. It is one of seven buildings within the<br />

SRB ARF complex. The Manufacturing Building is used to fabricate and process inert or<br />

non-propellant SRB elements including the forward and aft skirts, frustums, and nose<br />

caps. Other operations include the replacement of thermal protection on the SRB<br />

components, installation of electronic and guidance systems, integration of SRB recovery<br />

October 2007<br />

Archaeological Consultants, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!