10.07.2015 Views

department of defense handbook guidance for acquisition ... - NAVAIR

department of defense handbook guidance for acquisition ... - NAVAIR

department of defense handbook guidance for acquisition ... - NAVAIR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MIL-HDBK-29612-1Ab. Sample #2 provides an RFP statement example <strong>for</strong> conducting an evaluation, as follows:“The <strong>of</strong>feror shall provide a summary <strong>of</strong> previous experience in conducting trainingevaluations. The <strong>of</strong>feror shall also define the management and technical processes to beused <strong>for</strong> the evaluation <strong>of</strong> training. The statement <strong>for</strong> management processes shallinclude but not be limited to Quality Assurance (QA), metrics, scheduling, tests, and riskmanagement. The technical processes shall include but not be limited to the following:1. Method(s) <strong>for</strong> conducting a training evaluation.2. Method(s) <strong>for</strong> data analysis.3. Method(s) <strong>for</strong> determining evaluation findings.4. Method(s) <strong>for</strong> determining conclusions and recommendations.5. Methodology <strong>for</strong> developing evaluation background data.”c. Sample #3 provides an RFP statement example <strong>for</strong> conducting a test and evaluation <strong>of</strong> theinstructional delivery system, as follows:“The <strong>of</strong>feror shall provide a summary <strong>of</strong> previous experience in conducting test andevaluation <strong>of</strong> instructional delivery systems. The <strong>of</strong>feror shall also define themanagement and technical processes to be used <strong>for</strong> the test and evaluation <strong>of</strong> theinstructional delivery system. The statement <strong>for</strong> management processes shall include butnot be limited to Quality Assurance (QA), metrics, scheduling, tests, and riskmanagement. The technical processes shall include but not be limited to the following:1. The method(s) <strong>for</strong> developing the contractual acceptance plan.2. The method(s) <strong>for</strong> identifying the critical issues <strong>for</strong> the operational test andevaluation <strong>of</strong> the instructional delivery system.”5.1.8.3 Data requirements tailoring <strong>for</strong> the training evaluation document. DID number DI-SESS-81524B, Training Evaluation Document, identifies the data requirements <strong>for</strong> an evaluation<strong>of</strong> the efficiency <strong>of</strong> existing training systems and emerging systems relative to current systemsimilarities. The data provided in a training evaluation document can serve as the baseline toinfluence the modification <strong>of</strong> a training system. The following are some suggestions <strong>for</strong> tailoringDI-SESS-81524B:a. In instances where only training evaluation planning data is required, suggest deletion <strong>of</strong>DID paragraphs 2.4 through 2.5.b. In instances where only training evaluation results data is required, suggest deletion <strong>of</strong>DID paragraphs 2.3 and 2.5.c. In instances where only an instructional delivery system test and evaluation is required,suggest deletion <strong>of</strong> DID paragraphs 2.3 through 2.4.4.45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!