11.07.2015 Views

Agroindustrial project analysi

Agroindustrial project analysi

Agroindustrial project analysi

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THE PROCESSING FACTOR 141* Availability of desired demand on year-round basis* Tie-ins with state power gridEffect of grid outages on power for plant siteWillingness of electricians to repair "hot" or live lines* Cost of purchased powerTerms of contractDocumentationPotable water* Demand, load and pressures, temperatures* Source and availability* Boiler feed-water treatment required* Cost* Kind of boiler fuel, its source and availabilityCooling water* Maximum wet bulb design* Cooling tower; river water or seawater?* Intake works* Discharge* Corrosion protection* Pollution problem* Distance to intake* Right of way for supply and discharge* Permits requiredOfficials: names, titles, addressesObtained by whom?When?Present statusDocumentationi CostProcess water- Demand (both actual and <strong>project</strong>ed) and load at full capacity- Source and availability* Treatment* CostIn addition, the analyst should also assess the transport infrastructure,including roads, railroad sidings, and storage terminals.In one East African country, a corned-beef processing plant was

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!