11.07.2015 Views

Agroindustrial project analysi

Agroindustrial project analysi

Agroindustrial project analysi

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

164 AGROINDUSTRIAL PROJECT ANALYSISDryer 1970volume 1970 f.o.b. 1970 f.o.b. cost of trays, installed(cubic feet) dryer cost trucks, controls cost100 4,000 750 for trays (250 square feet 8,175at $3 a square foot)300 for 1 truck/rack400 for controls400 4,800 3,000 for trays (1,000 square 14,200feet at $3 a square foot)900 for 3 trucks800 for controls800 9,600 6,000 for trays (2,000 square 27,300feet at $3 a square foot)1,800 for 6 trucks800 for controlsThe operating cost estimates (given in the first tabulation, above)are derived according to the following assumptions:* Two man-hours to load/unload fifty trays or one truck in each12-hour drying cycleITwo and three-quarters pounds of steam or its equivalent inenergy is required to evaporate I pound of water• Maintenance cost of 3-5 percent of installed cost yearly for a300-day year* One-third man-hour to supervise the machine during drying* Unskilled labor at an hourly wage of $4* Three shifts and 24-hour operation* No amortization has been taken into consideration.By these assumptions, daily 1977 operating costs can be disaggregatedin the following tabulation:Dryer volume Trays(cubic feet) (number) Labor Maintenance100 50 48 1.80400 200 96 3.13800 400 160 6.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!